Delaware River Joint Toll Bridge Commission - Professional Engineering Services for Hard All Electronic Tolling (AET) Final Design - DRJTBC Contract No. C-753A, Capital Project 2016I
Delaware River Joint Toll Bridge Commission Of Pa And NjSpecial District · Morrisville, PA- Due
- Sep 17, 2026
- Deadline passed
- Posted
- Aug 11, 2026
- Contract term
- 1 year
- Primary contact
- Bhushan V. Pathare
- (267) 394-6700
The 30-second brief
The Delaware River Joint Toll Bridge Commission invites proposals for professional engineering design services for the Hard All Electronic Tolling (AET) Final Design Central & Northern Region Toll Bridges project, DRJTBC Contract No. C-753A, Capital Project 2016I. The work encompasses final civil infrastructure design for five Toll Plaza AET conversions across the Central and Northern regions: Interstate 78, Easton - Phillipsburg (US Route 22), Portland - Columbia (PA Route 611 & NJ Route 94), Delaware Water Gap (Interstate 80), and Milford - Montague (US Route 206) Toll Bridges. Key requirements include roadway design, toll plaza demolition, gantry and equipment building infrastructure, electronic surveillance system (ESS) coordination, utility coordination, environmental compliance, and support during bidding and construction phases. Proposals are due by September 17, 2026, at 2:00 PM local time. A pre-proposal submission meeting will be held on August 18, 2026, and inquiries are due by August 25, 2026. The contract includes an Identified Business Enterprise (IBE) participation target of 25%.
Professional engineering services, Preliminary design documents, Final design contract documents, Pre-award bidding support, Post-award construction support
Understanding of the Project and Commission Needs (60% weight for technical proposal combined with oral presentations), Management Approach to the Project, Detailed Work Plan, Consultant's Experience on Similar Projects, Experience and Credentials of the Project Team, Ability to adhere to the Commission's Project Schedule and Budget, IBE Participation, Oral Presentations (40% weight in overall evaluation)
Hear what Delaware River Joint Toll Bridge Commission Of Pa And Nj plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Delaware River Joint Toll Bridge Commission invites proposals for professional engineering design services for the Hard All Electronic Tolling (AET) Final Design Central & Northern Region Toll Bridges project, DRJTBC Contract No.
C-753A, Capital Project 2016I. The work encompasses final civil infrastructure design for five Toll Plaza AET conversions across the Central and Northern regions: Interstate 78, Easton - Phillipsburg (US Route 22), Portland - Columbia (PA Route 611 & NJ Route 94), Delaware Water Gap (Interstate 80), and Milford - Montague (US Route 206) Toll Bridges. Key requirements include roadway design, toll plaza demolition, gantry and equipment building infrastructure, electronic surveillance system (ESS) coordination, utility coordination, environmental compliance, and support during bidding and construction phases. Proposals are due by September 17, 2026, at 2:00 PM local time. A pre-proposal submission meeting will be held on August 18, 2026, and inquiries are due by August 25, 2026. The contract includes an Identified Business Enterprise (IBE) participation target of 25%.
EVALUATION CRITERIA
Understanding of the Project and Commission Needs (60% weight for technical proposal combined with oral presentations), Management Approach to the Project, Detailed Work Plan, Consultant's Experience on Similar Projects, Experience and Credentials of the Project Team, Ability to adhere to the Commission's Project Schedule and Budget, IBE Participation, Oral Presentations (40% weight in overall evaluation)
REQUIRED DELIVERABLES
5- Professional engineering services
- Preliminary design documents
- Final design contract documents
- Pre-award bidding support
- Post-award construction support
REQUIRED ATTACHMENTS
11- Letter of Transmittal
- Technical Proposal
- Fee Proposal
- Organizational Chart
- Resumes
- Schedule A - Hourly Breakdown of Work Program
- Sample Certificate of Insurance
- Insurance and Indemnification Certification Form (Attachment III)
- Conflict of Interest and Recusal Certification Form (Attachment IV)
- IBE Participation Forms
- Prequalification documentation
REQUIRED STAFFING
7- Submit to
- [email protected]
- Scope location
- Yardley, Pennsylvania
- Reported agency
- Delaware River Joint Toll Bridge Commission
Questions about this RFP
How do I respond to this RFP from Delaware River Joint Toll Bridge Commission Of Pa And Nj?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 17, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact Bhushan V. Pathare.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Delaware River Joint Toll Bridge Commission Of Pa And Nj in PA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Bhushan V. Pathare at (267) 394-6700. Questions and answers are typically shared with all prospective bidders.
What staffing is required for this project?
This solicitation outlines specific staffing requirements. The required roles include: Project Principal, Project Manager, Senior Engineer, Engineer, Senior Tech, Junior Tech, Project Admin. Proposers should demonstrate relevant qualifications and experience for each required role.
What are the key deliverables?
The solicitation specifies the following deliverables: Professional engineering services, Preliminary design documents, Final design contract documents, Pre-award bidding support, Post-award construction support. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Understanding of the Project and Commission Needs (60% weight for technical proposal combined with oral presentations), Management Approach to the Project, Detailed Work Plan, Consultant's Experience..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Delaware River Joint Toll Bridge Commission Of Pa And Nj?
All active and historical solicitations from Delaware River Joint Toll Bridge Commission Of Pa And Nj are tracked and searchable. As a special district agency, Delaware River Joint Toll Bridge Commission Of Pa And Nj regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 1 year. Contract terms may include renewal options.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Letter of Transmittal, Technical Proposal, Fee Proposal, Organizational Chart, Resumes, Schedule A - Hourly Breakdown of Work Program, Sample Certificate of Insurance, Insurance and Indemnification Ce. Additionally, proposals should address staffing requirements as outlined in the solicitation. Review the full document from Delaware River Joint Toll Bridge Commission Of Pa And Nj for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Yardley, Pennsylvania. Review the full solicitation for detailed scope requirements.