RFPOPEN
Save

Curry Health Network - Curry Medical Center Plumbing Re-Pipe Project - 2026

Curry General Hospital logoCurry General Hospital
Due
Nov 6, 2026
9 days left
Posted
Oct 7, 2026
Duration
5 months

The 30-second brief

What they're buying

Curry Health Network is seeking qualified contractors to submit proposals for replacement of the domestic water piping system at Curry Medical Center (CMC) in Brookings, Oregon. The project involves replacing the existing deteriorating CPVC system with new copper distribution mains and PEX branch piping from mains to user points, reconnecting existing fixtures, installing isolation/balancing valves, supports, insulation, and performing testing, disinfection, and architectural restoration. The facility will remain operational as an active healthcare facility throughout construction, requiring phased work, ICRA/ILSM compliance, infection control, and off-hours scheduling for disruptive activities. Proposals are due by November 6, 2026, at 5:00 pm, following a mandatory pre-proposal meeting and site walk on October 20, 2026, at 10 am. The work is subject to Oregon prevailing wage requirements under ORS 279C.800 to 279C.870, certified payroll, public works bond, and specific commercial general liability and builder's risk insurance minimums.

What you must deliver

Lump-sum Base Bid, Construction schedule, Cover letter, Relevant experience, Project team qualifications, Approach to construction, Cost breakdown, Exceptions and clarifications, Bid Form Exhibit B

How it's scored

Technical Qualifications and Relevant Experience of the Firm (30), Qualifications of Key Personnel (25), Project Understanding and Work Plan (25), Total Project Cost (20)

9 days left to submitDue Nov 6

Get the decision makers at Curry General Hospital before you write a word.

Get decision-maker emails

Free account · 30-second setup · No credit card

Summary

Curry Health Network is seeking qualified contractors to submit proposals for replacement of the domestic water piping system at Curry Medical Center (CMC) in Brookings, Oregon.

The project involves replacing the existing deteriorating CPVC system with new copper distribution mains and PEX branch piping from mains to user points, reconnecting existing fixtures, installing isolation/balancing valves, supports, insulation, and performing testing, disinfection, and architectural restoration. The facility will remain operational as an active healthcare facility throughout construction, requiring phased work, ICRA/ILSM compliance, infection control, and off-hours scheduling for disruptive activities. Proposals are due by November 6, 2026, at 5:00 pm, following a mandatory pre-proposal meeting and site walk on October 20, 2026, at 10 am. The work is subject to Oregon prevailing wage requirements under ORS 279C.800 to 279C.870, certified payroll, public works bond, and specific commercial general liability and builder's risk insurance minimums.

EVALUATION CRITERIA

Technical Qualifications and Relevant Experience of the Firm30
Qualifications of Key Personnel25
Project Understanding and Work Plan25
Total Project Cost20

REQUIRED DELIVERABLES

9
  • Lump-sum Base Bid
  • Construction schedule
  • Cover letter
  • Relevant experience
  • Project team qualifications
  • Approach to construction
  • Cost breakdown
  • Exceptions and clarifications
  • Bid Form Exhibit B

REQUIRED ATTACHMENTS

Bid Form

Scope location
Brookings, Oregon
Reported agency
Curry Health Network

Questions about this RFP

How do I respond to this RFP from Curry General Hospital?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 6, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected] AND [email protected].

Can small businesses or minority-owned firms bid on this RFP?

Most government agencies, including Curry General Hospital in OR, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the RFP submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

What are the key deliverables?

The solicitation specifies the following deliverables: Lump-sum Base Bid, Construction schedule, Cover letter, Relevant experience, Project team qualifications, Approach to construction, Cost breakdown, Exceptions and clarifications, Bid Form Exhibit B. Proposals should clearly address how each deliverable will be met.

Show 6 more questions

What are the evaluation criteria for this solicitation?

This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Technical Qualifications and Relevant Experience of the Firm (30), Qualifications of Key Personnel (25), Project Understanding and Work Plan (25), Total Project Cost (20)" Vendors should carefully align their proposals with each criterion to maximize their score.

Where can I find more RFPs from Curry General Hospital?

All active and historical solicitations from Curry General Hospital are tracked and searchable. As a public hospital agency, Curry General Hospital regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What is the contract term for this solicitation?

The anticipated contract term is 5 months. Contract terms may include renewal options.

Is this solicitation still open for submissions?

Based on the posted deadline of November 6, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.

What documents are required to bid on this RFP?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Form. Review the full document from Curry General Hospital for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Brookings, Oregon. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required