City of Woodstock Towne Lake Parkway Widening Construction Bid 2025
- Due
- Nov 4, 2025
- Deadline passed
- Contract term
- 1 year
Hear what Woodstock plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The City of Woodstock is soliciting bids for the Towne Lake Parkway Widening project.
The scope of work includes furnishing all materials, labor, and equipment for complete construction, featuring erosion control, maintenance of traffic, paving, grading, excavation, subgrade preparation, and drainage construction. Additional requirements involve wall construction, utility installation, concrete surface course, sidewalks, signs, pavement marking, and grassing at specified locations. The project location is 12453 Highway 92, Woodstock, GA 30188. The contract timeframe is 365 calendar days. Submissions are due by November 4, 2025, at 10:00 AM.
- Duration
- 12 months
- Scope location
- Woodstock, GA
Questions about this BID
How do I respond to this Bid from City of Woodstock?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 4, 2025.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Woodstock in GA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Show 4 more questions
Where can I find more RFPs from City of Woodstock?
All active and historical solicitations from City of Woodstock are tracked and searchable. As a city agency, City of Woodstock regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 1 year. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from City of Woodstock for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Woodstock, GA. Review the full solicitation for detailed scope requirements.