City of Westminster - Water System Improvements UNITY TANK R-26-1438 - 2026
- Due
- Sep 16, 2026
- Deadline passed
- Posted
- Aug 6, 2026
The 30-second brief
Sealed bids are requested by the City of Westminster for Water System Improvements UNITY TANK R-26-1438 Division I and Division II. Division I includes clearing, grubbing, site grading, site work, site piping, tank site construction, altitude and check valve vault, yard piping, erosion control, electrical controls, and fencing. Division II includes a 120,000 Gallon Steel Ground Storage Tank and Foundation, design and construction of the ground structure, and related appurtenances. Bids are due by 2:00 PM on September 16, 2026. A non-mandatory pre-bid conference is scheduled for September 9, 2026. Funded by South Carolina Rural Infrastructure Authority (RIA) grant.
Lowest responsible bid
Hear what Westminster plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Sealed bids are requested by the City of Westminster for Water System Improvements UNITY TANK R-26-1438 Division I and Division II. Division I includes clearing, grubbing, site grading, site work, site piping, tank site construction, altitude and check valve vault, yard piping, erosion control, electrical controls, and fencing.
Division II includes a 120,000 Gallon Steel Ground Storage Tank and Foundation, design and construction of the ground structure, and related appurtenances. Bids are due by 2:00 PM on September 16, 2026. A non-mandatory pre-bid conference is scheduled for September 9, 2026. Funded by South Carolina Rural Infrastructure Authority (RIA) grant.
EVALUATION CRITERIA
Lowest responsible bid
REQUIRED ATTACHMENTS
security
- Submit to
- P.O. Box 399 / 100 E. Windsor Street, Westminster, SC 29693
- Scope location
- Westminster, SC
Questions about this BID
How do I respond to this Bid from City of Westminster?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 16, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: P.O. Box 399 / 100 E. Windsor Street, Westminster, SC 29693.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Westminster in SC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest responsible bid" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from City of Westminster?
All active and historical solicitations from City of Westminster are tracked and searchable. As a city agency, City of Westminster regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: security. Review the full document from City of Westminster for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Westminster, SC. Review the full solicitation for detailed scope requirements.