City of Burnaby - Roadworks on Marine & Broadway - CA-7026-3487-3345-3355 (2026)
- Due
- Oct 22, 2026
- Deadline passed
- Posted
- Sep 24, 2026
The 30-second brief
The City of Burnaby invites tenders for roadworks and infrastructure improvements including 5,785 metric tonnes of roadway asphalt, 1,905 square meters of full depth milling, 2,295 square meters of reshaping, 30,885 square meters of surface milling, 560 lineal meters of concrete curb and gutter, 830 square meters of concrete sidewalk and driveway crossings, 170 square meters of concrete truck apron, 60 tonnes of asphalt multi-use pathway, 860 metric tonnes of gravel, traffic islands, landscaping, restoration, pavement markings, signage, adjustments, drainage, traffic signals, and streetlighting. Work locations include Marine Way, Byrne Road, Broadway, and various intersections like Canada Way. This tender (CA-7026-3487-3345-3355) is issued electronically through the on-line bidding system, with a submission deadline of October 22, 2026. Only pre-qualified contractors for the Area of Specialization of Roads - 2.0 are invited to tender this project.
5, 785 metric tonnes of roadway asphalt, 1, 905 square meters of full depth milling, 2, 295 square meters of reshaping, 30, 885 square meters of surface milling, 560 lineal meters of concrete curb and gutter, 830 square meters of concrete sidewalk and driveway crossings, 170 square meters of concrete truck apron, 60 tonnes of asphalt multi-use pathway, 860 metric tonnes of gravel, Traffic islands, Landscaping, Restoration, Pavement markings, Signage, Adjustments, Drainage, Traffic signals, Streetlighting
Get notified when Burnaby posts the next one.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The City of Burnaby invites tenders for roadworks and infrastructure improvements including 5,785 metric tonnes of roadway asphalt, 1,905 square meters of full depth milling, 2,295 square meters of reshaping, 30,885 square meters of surface milling, 560 lineal meters of concrete curb and gutter, 830 square meters of concrete sidewalk and driveway crossings, 170 square meters of concrete truck apron, 60 tonnes of asphalt multi-use pathway, 860 metric tonnes of gravel, traffic islands, landscaping, restoration, pavement markings, signage, adjustments, drainage, traffic signals, and streetlighting.
Work locations include Marine Way, Byrne Road, Broadway, and various intersections like Canada Way. This tender (CA-7026-3487-3345-3355) is issued electronically through the on-line bidding system, with a submission deadline of October 22, 2026. Only pre-qualified contractors for the Area of Specialization of Roads - 2.0 are invited to tender this project.
REQUIRED DELIVERABLES
22- 5
- 785 metric tonnes of roadway asphalt
- 1
- 905 square meters of full depth milling
- 2
- 295 square meters of reshaping
- 30
- 885 square meters of surface milling
- 560 lineal meters of concrete curb and gutter
- 830 square meters of concrete sidewalk and driveway crossings
- 170 square meters of concrete truck apron
- 60 tonnes of asphalt multi-use pathway
- 860 metric tonnes of gravel
- Traffic islands
- Landscaping
- Restoration
- Pavement markings
- Signage
- Adjustments
- Drainage
- Traffic signals
- Streetlighting
- Submit to
- https://burnaby.bidsandtenders.ca
- Scope location
- Burnaby, BC
Questions about this BID
How do I respond to this Bid from City of Burnaby?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 22, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: https://burnaby.bidsandtenders.ca.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Burnaby in BC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: 5, 785 metric tonnes of roadway asphalt, 1, 905 square meters of full depth milling, 2, 295 square meters of reshaping, 30, 885 square meters of surface milling, 560 lineal meters of concrete curb and gutter, 830 square meters of concrete sidewalk and driveway crossings, 170 square meters of concret. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from City of Burnaby?
All active and historical solicitations from City of Burnaby are tracked and searchable. As a city agency, City of Burnaby regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from City of Burnaby for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Burnaby, BC. Review the full solicitation for detailed scope requirements.