City of Brighton Engineering Design Standards Invitation to Bid 2026
- Due
- May 20, 2026
- Deadline passed
The 30-second brief
The City of Brighton is issuing an Invitation to Bid for projects governed by its Engineering Design Standards. The scope of work encompasses comprehensive municipal infrastructure requirements including storm water management systems (detention/retention basins, underground containment), site grading and soil erosion control, municipal sanitary sewer systems (pump stations, force mains), and municipal water systems (distribution piping, hydrants, valves). It also includes detailed standards for parking lot and road design (arterial, collector, industrial, and local classifications). The solicitation references technical specifications for submittals, horizontal directional drilling, and casing pipe construction. Bids must comply with the City's 2015 Engineering Design Standards and COVID-19 Preparedness and Response Plan. Submissions are due by May 20, 2026.
Construction plans, Soil boring logs, Traffic circulation plan, Shop drawings, As-built drawings
Hear what Brighton plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The City of Brighton is issuing an Invitation to Bid for projects governed by its Engineering Design Standards.
The scope of work encompasses comprehensive municipal infrastructure requirements including storm water management systems (detention/retention basins, underground containment), site grading and soil erosion control, municipal sanitary sewer systems (pump stations, force mains), and municipal water systems (distribution piping, hydrants, valves). It also includes detailed standards for parking lot and road design (arterial, collector, industrial, and local classifications). The solicitation references technical specifications for submittals, horizontal directional drilling, and casing pipe construction. Bids must comply with the City's 2015 Engineering Design Standards and COVID-19 Preparedness and Response Plan. Submissions are due by May 20, 2026.
REQUIRED DELIVERABLES
5- Construction plans
- Soil boring logs
- Traffic circulation plan
- Shop drawings
- As-built drawings
REQUIRED ATTACHMENTS
4- COVID-19 Preparedness and Response Plan
- Engineering Design Standards
- Construction Phase Closure Checklist
- Environmental Permits Checklist
- Scope location
- Brighton, MI
Questions about this BID
How do I respond to this Bid from City of Brighton?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is May 20, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Brighton in MI, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Construction plans, Soil boring logs, Traffic circulation plan, Shop drawings, As-built drawings. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from City of Brighton?
All active and historical solicitations from City of Brighton are tracked and searchable. As a city agency, City of Brighton regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: COVID-19 Preparedness and Response Plan, Engineering Design Standards, Construction Phase Closure Checklist, Environmental Permits Checklist. Review the full document from City of Brighton for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Brighton, MI. Review the full solicitation for detailed scope requirements.