ABC Unified School District Gonsalves Elementary School Modernization Bid No. 1708 (2026)
- Due
- Oct 20, 2026
- Deadline passed
- Posted
- Sep 22, 2026
- Contract term
- 1 year
The 30-second brief
ABC Unified School District invites sealed bids for the Gonsalves Elementary School Modernization project (Bid No. 1708, A#03-126137) and de-mobilization of interim housing project (A#03-126118) located in Cerritos, CA. The scope includes general construction, modernization, framing, ceramic tile, restroom remodeling, finishes, paint, carpet, LVT flooring, acoustical ceiling tiles, doors and hardware, roller shades, casework, plumbing, access control systems, low voltage and fire alarm systems, electrical upgrades, intrusion systems, and site work. The contract time for construction is 208 consecutive calendar days, running from December 21, 2026, to July 16, 2027. Bids are due by October 20, 2026, at 2:00 PM at the Purchasing Department. A mandatory pre-bid conference and job walk was held on September 22, 2026, at 9:00 AM at Gonsalves Elementary School, 13650 Park St., Cerritos, CA 90703. Pre-bid clarifications are due by October 09, 2026, at 12:00 PM. Prime contractors holding A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 licenses must be prequalified by October 15, 2026, at 12:00 PM via PQ Bids. Required licenses include a Class B General Building Contractor prime license, along with specialty trades for C-7, C-10, C-16, C-20, and C-36. Prevailing wages, DIR registration, CARB compliance, and bid security of 10% are required.
MODERNIZATION PROJECT (A#03-126137) INCLUDING EXISTING CONDITION ALLOWANCES LISTED IN SECTION 012100; DE-MOBILIZATION OF INTERIM HOUSING PROJECT (A#03-126118)
Lowest responsive responsible bidder
Hear what ABC Unified plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
ABC Unified School District invites sealed bids for the Gonsalves Elementary School Modernization project (Bid No. 1708, A#03-126137) and de-mobilization of interim housing project (A#03-126118) located in Cerritos, CA. The scope includes general construction, modernization, framing, ceramic tile, restroom remodeling, finishes, paint, carpet, LVT flooring, acoustical ceiling tiles, doors and hardware, roller shades, casework, plumbing, access control systems, low voltage and fire alarm systems, electrical upgrades, intrusion systems, and site work.
The contract time for construction is 208 consecutive calendar days, running from December 21, 2026, to July 16, 2027. Bids are due by October 20, 2026, at 2:00 PM at the Purchasing Department. A mandatory pre-bid conference and job walk was held on September 22, 2026, at 9:00 AM at Gonsalves Elementary School, 13650 Park St., Cerritos, CA 90703. Pre-bid clarifications are due by October 09, 2026, at 12:00 PM. Prime contractors holding A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 licenses must be prequalified by October 15, 2026, at 12:00 PM via PQ Bids. Required licenses include a Class B General Building Contractor prime license, along with specialty trades for C-7, C-10, C-16, C-20, and C-36. Prevailing wages, DIR registration, CARB compliance, and bid security of 10% are required.
EVALUATION CRITERIA
Lowest responsive responsible bidder
REQUIRED DELIVERABLES
MODERNIZATION PROJECT (A#03-126137) INCLUDING EXISTING CONDITION ALLOWANCES LISTED IN SECTION 012100; DE-MOBILIZATION OF INTERIM HOUSING PROJECT (A#03-126118)
REQUIRED ATTACHMENTS
14- Designation of Subcontractors
- Bid Form
- Contractor’s Certificate Regarding Workers Compensation
- Non-Collusion Declaration
- Bid Bond or Bid Guarantee form
- Substitution Request Form
- Acknowledgment of Bidding Practices Regarding Indemnity
- DVBE Participation Statement
- CARB Compliance Certification
- Contractor’s Certificate Regarding Drug-Free Workplace
- Contractor’s Certificate Regarding Alcoholic Beverage and Tobacco-Free Campus Policy
- Site Visit Certification
- Bidder’s Reference
- Signed Addenda Cover Sheet
- Submit to
- Purchasing Department, ABC Unified School District, 16700 Norwalk Blvd., Cerritos, CA 90703
- Duration
- 7 months
- Scope location
- Cerritos, CA
- Reported agency
- ABC Unified School District
Questions about this BID
How do I respond to this Bid from ABC Unified?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 20, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: Purchasing Department, ABC Unified School District, 16700 Norwalk Blvd., Cerritos, CA 90703.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including ABC Unified in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: MODERNIZATION PROJECT (A#03-126137) INCLUDING EXISTING CONDITION ALLOWANCES LISTED IN SECTION 012100; DE-MOBILIZATION OF INTERIM HOUSING PROJECT (A#03-126118). Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest responsive responsible bidder" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from ABC Unified?
All active and historical solicitations from ABC Unified are tracked and searchable. As a school agency, ABC Unified regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 1 year. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Designation of Subcontractors, Bid Form, Contractor’s Certificate Regarding Workers Compensation, Non-Collusion Declaration, Bid Bond or Bid Guarantee form, Substitution Request Form, Acknowledgment o. Review the full document from ABC Unified for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Cerritos, CA. Review the full solicitation for detailed scope requirements.