Stormwater pipe replacement options
Country Club villageMissouri- Detected
- Aug 11, 2026
- 95 days ago
- Sector
- Capital Projects
- Est. value
- Free account
Get pre-RFPs like this one before they're bid.
Get briefs like this freeFree account · 30-second setup · No credit card
From the meeting
The packet included two engineering cost opinions for flooding near 13 Chadwick Lane. One option was a $145,000 new and upgraded storm system with 320 feet of 30-inch N12 storm pipe; the other was a $64,000 replacement and upgrade for a collapsed 30-inch CMP to 36-inch N12 HDPE. The village has not selected a path yet, so this is a live capital planning item tied to a real drainage problem.
- Meeting date
- August 11, 2026
- Agency
- Country Club village
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will Country Club village issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Country Club village's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with Country Club village before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account sends you the pre-RFPs that fit what you sell, with the AI brief and the decision makers for the top matches in each digest.
Where can I find more capital projects government opportunities in Missouri?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces capital projects pre-RFPs in Missouri as soon as they appear — months before they reach bid portals.