Lake Tarpon flood study support
Pinellas Technical College-ClearwaterFlorida- Detected
- Aug 11, 2026
- 84 days ago
- Sector
- Public Works
Get pre-RFPs like this one before they're bid.
Get briefs like this freeFree account · 30-second setup · No credit card
From the meeting
The Board approved a letter supporting a USACE Section 216 feasibility study for the Lake Tarpon Outfall Structure (S-551) and Outfall Canal (C-351). 5 million in matching funds already committed. The study could drive future flood-control design, engineering, and construction work if it moves ahead.
- Meeting date
- August 11, 2026
- Agency
- Pinellas Technical College-Clearwater
More from Pinellas Technical College-Clearwater
Similar pre-RFPs forming now
Matching work at other agencies, before it reaches a bid portal.
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will Pinellas Technical College-Clearwater issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Pinellas Technical College-Clearwater's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with Pinellas Technical College-Clearwater before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account sends you the pre-RFPs that fit what you sell, with the AI brief and the decision makers for the top matches in each digest.
Where can I find more public works government opportunities in Florida?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces public works pre-RFPs in Florida as soon as they appear — months before they reach bid portals.