Utility Service Contract for Hidden Oaks Subdivision (43 Lots)
Bois Darc MudTexas- Detected
- Apr 17, 2026
- 194 days ago
- Sector
- Utilities
See the full project brief and when it goes to bid.
Unlock the full briefFree account · 30-second setup · No credit card
THE 30-SECOND BRIEF
Provision of water utility service, including required infrastructure and connections, to 43 single-family residential lots in the Hidden Oaks subdivision along CR 2980.
Inferred: Project scope will likely include new water main extensions, meters, and related infrastructure; potential for subcontracting to engineering and construction firms.
From the meeting
- Meeting date
- April 17, 2026
- Agency
- Bois Darc Mud
More from Bois Darc Mud
Similar pre-RFPs forming now
Matching work at other agencies, before it reaches a bid portal.
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will Bois Darc Mud issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Bois Darc Mud's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with Bois Darc Mud before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account unlocks this pre-RFP's source document, forecasted RFP timing, and verified Bois Darc Mud decision-maker contacts.
Where can I find more utilities government opportunities in Texas?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces utilities pre-RFPs in Texas as soon as they appear — months before they reach bid portals.