Sewer blower control panel replacement
City of PaterosWashington- Detected
- Sep 21, 2026
- 44 days ago
- Sector
- Equipment
Get pre-RFPs like this one as they surface.
Get briefs like this freeFree account · 30-second setup · No credit card
From the meeting
One of the two sewer plant blower control panels failed, and the administrator ordered replacement of both control panels. The panels are 26 years old, so this is a clear replacement need rather than routine maintenance. The city has already moved into purchase and installation planning.
- Meeting date
- September 21, 2026
- Agency
- City of Pateros
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will City of Pateros issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks City of Pateros's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with City of Pateros before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account sends you the pre-RFPs that fit what you sell, with the AI brief and the decision makers for the top matches in each digest.
Where can I find more equipment government opportunities in Washington?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces equipment pre-RFPs in Washington as soon as they appear — months before they reach bid portals.