Bonner County Government Contracts, RFPs & Bids

Browse government projects, RFPs, and bids from 23 agencies in Bonner County, Idaho.

IDUpdated weekly
33Projects
23Agencies
11Sectors

Bonner County is planning your next contract right now.

We read every board minute and budget in Bonner County. You get the projects — with decision-maker contacts — before the RFP.

A Civic IQ specialist will call with a 15-min briefing on opportunities in your state.

Trusted by teams at

Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo

Recent Projects

Government Projects in Bonner County

33 projects across 4 agencies — sorted by relevance and recency.

Purchase of virtual migration RMS system services.

Contract Award
$3,513,510Jul 21, 2026

Approval of FY26 claims batch number 42.

Contract Award
$3,979,142Jul 21, 2026

Sandpoint staff briefed Council on Downtown Revitalization Phase 3 and reported a $1.796 million LHTAC grant award for the First/Bridge/Church intersection. Council directed staff to plan for federal funding requirements, delay construction to fall 2027, and extend design and construction south on First Avenue to Superior Street. This sets up a larger, federally funded streetscape and utility project where engineering, design refinement, construction, and project management support will be needed before bids are issued.

Pre-RFP
$1,796,000Jun 17, 2026

Sandpoint awarded the Cedar Street Reconstruction contract (Lincoln Ave to Division Ave) to Stewart Contracting, Inc. for $2,097,705 after receiving seven bids. Work includes full road reconstruction, new asphalt, stormwater upgrades, water main upsizing from 6" to 8", sewer line work, and streetscape/pedestrian improvements, with construction scheduled June–October 2026. Although the prime is set, this multi-fund project offers near-term subcontracting, materials supply, traffic control, and future corridor improvement angles.

Contract Award
$2,097,705Jun 3, 2026

Acquisition of parks property, specifically the Union Pacific Right of Way and Baldfoot disc golf course property.

Active Opportunity
$1,400,000Jul 2, 2026

Redesign and construction of the RV park at City Beach, including RV site configuration, circulation, and amenities.

Active Opportunity
$830,000Jul 2, 2026

Lakeland Joint School District terminated a $577,096 sidewalks concrete contract with WM Welch Corp in March 2026 for defective work across multiple schools and has filed a performance/payment bond claim with Old Republic Surety. Architects West estimates about $332,000 in corrective work is needed, and Ginno Construction is already under a CMGC contract that could be used to bid and manage the replacement, with summer 2026 as the critical work window. This is an active planning/completion issue where the district and surety must select completion contractors and finalize scope and pricing for extensive demolition, re-pour, surveying, ADA fixes, and related site work.

Pre-RFP
$332,370Jun 17, 2026

The Board received a preview of the FY 2027 budget and plans to discuss it in June, publish in July, and adopt in August, with a draft showing a 5.9% expense increase and 1% revenue increase. The budget allocates funds to licensed operator contracts, consulting, chemicals, collection system repairs, and capital projects such as DEQ loan service and capital replacements. This is a forward-looking funding signal that shapes how much the District can spend on services, equipment, and capital work in 2027.

Budget Planning
$398,359Jun 15, 2026

The district’s proposed reallocation keeps 140000 in the FY25 line labeled “AE, GE, LHS, SLE (continuation)” for ongoing flooring projects, and creates a separate 40000 line for “GE Cafeteria,” both currently in the planning stage. The narrative notes that Garwood Elementary’s cafeteria floor is in “desperate need of replacement,” while Betty Kiefer’s cafeteria floor no longer requires replacement, and that this reallocation will still leave 140000 available for other flooring projects. These items are marked as “Quotes” or “Seeking Approval,” indicating scope is identified but vendors are not yet finalized beyond use of the Sourcewell flooring cooperative for some work. Flooring, abatement, and construction vendors can assist with detailed assessments, alternates, and scheduling for Summer 2026 work at multiple campuses as the district refines quotes and awards packages.

Pre-RFP
$180,000May 20, 2026

The Commission recommended approval of the Skyway Estates preliminary plat to subdivide about 4.5 acres at 2708 N. Boyer Ave into 26 single-family lots with new streets and utility infrastructure. The project includes stormwater systems, sidewalks, a multi‑use path, and water/sewer extensions, with design revisions underway at the request of the city engineer. This sets up near-term work for site/civil contractors, utility crews, paving, and homebuilders as the owner moves from preliminary plat to final plat and construction drawings.

Pre-RFP
$0Jul 7, 2026

Showing 10 of 33

Explore Bonner County's government projects — free.

Self-serve. No call required. Live data in minutes.

Try Civic IQ for free →

Frequently Asked Questions

Procurement FAQs for Bonner County, Idaho

Bring us your territory.
We'll show you what is forming.

B2G and SLED sales intelligence. Surface government procurement signals from 80,000+ state, local, and education agencies months before the RFP.

Try Civic IQ for free