Town of Stonington WPCA - River Road Pump Station Upgrades - ITB #2026-005 (2026)
Town of StoningtonCity · Stonington, CT- Due
- Oct 15, 2026
- Deadline passed
- Posted
- Sep 10, 2026
- Primary contact
- James Sullivan
- (860) 343-8297
Hear what Stonington plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Town of Stonington Water Pollution Control Authority is seeking sealed bids for the construction of the River Road Pump Station Upgrades project located at 177 River Road, Pawcatuck, CT. Work includes demolition of existing emergency generator, motor control center, transformer, and electrical equipment, and construction of new sewage pumps, variable frequency drives, emergency generator, electrical system upgrades, flood barriers, and bypass pumping connections.
The project is funded in part by an EPA Community Grant Program and is subject to Davis-Bacon Act wage rates, American Iron and Steel (AIS) requirements, and Build America, Buy America (BABA) Act requirements. A mandatory pre-bid site walk will be held on September 29, 2026, at 10:00 am. Bids are due by October 15, 2026, at 2:00 pm.
REQUIRED ATTACHMENTS
7- Bid Form
- Required Bid Security
- Required Bidder Qualification Statement (Section 00450)
- Signed Compliance Statement (Section 00460)
- Non-Collusion Affidavit of Prime Bidder (Section 00408)
- List of Project References
- Signed Certificate of Contractor's Insurance Company Form (Section 00413)
- Submit to
- www.wright-pierce.com/projects
- Scope location
- Stonington, CT
- Reported agency
- Town of Stonington Water Pollution Control Authority
Questions about this BID
How do I respond to this Bid from Town of Stonington?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 15, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: www.wright-pierce.com/projects. For questions, contact James Sullivan.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Town of Stonington in CT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is James Sullivan at (860) 343-8297. Questions and answers are typically shared with all prospective bidders.
Show 3 more questions
Where can I find more RFPs from Town of Stonington?
All active and historical solicitations from Town of Stonington are tracked and searchable. As a city agency, Town of Stonington regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Form, Required Bid Security, Required Bidder Qualification Statement (Section 00450), Signed Compliance Statement (Section 00460), Non-Collusion Affidavit of Prime Bidder (Section 00408), List of. Review the full document from Town of Stonington for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Stonington, CT. Review the full solicitation for detailed scope requirements.