The 30-second brief
The Rural Municipality of Lake Lenore No. 399 invites bids for the 50 Avenue Road Rehabilitation project in the Town of Barrhead, Alberta, under contract 5450-004-00. The scope of work includes road structure removal, waste excavation, subgrade preparation, non-woven geotextile installation, granular base, prime coat, tack coat, hot mix asphalt paving, asphalt key-in, curb and gutter replacement, monolithic sidewalk replacement, appurtenance adjustments for valves and manholes, and site restoration. Quantities include 2,585 m2 of existing road structure removal, 517 m3 of waste excavation, 2,585 m2 of 300mm subgrade preparation, 2,585 m2 of non-woven geotextile, 2,585 m2 of 300mm granular base, 2,585 m2 prime coat, 2,585 m2 tack coat, 2,585 m2 of 100mm hot mix asphalt, 3 asphalt key-ins, 6 m of rolled curb and gutter, 34 m of monolithic sidewalk with rolled curb and gutter, 3 valve appurtenance adjustments, 2 manhole appurtenance adjustments, and 1 L.S. site restoration.
Remove Existing Road Structure: 2, 585 m2, Waste Excavation: 517 m3, 300mm Subgrade Preparation: 2, 585 m2, Non-Woven Geotextile: 2, 585 m2, 300mm Granular Base: 2, 585 m2, Prime Coat: 2, 585 m2, Tack Coat: 2, 585 m2, 100mm Hot Mix Asphalt: 2, 585 m2, Asphalt Key-In: 3 ea., Remove and Replace Rolled Curb and Gutter: 6 m, Remove and Replace Monolithic Sidewalk c/w Rolled Curb and Gutter: 34 m, Appurtenance Adjustment (Valve): 3 ea., Appurtenance Adjustment (Manhole): 2 ea., Site Restoration: 1 L.S.
Hear what Rural Municipality of Lake Lenore No. 399 plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Rural Municipality of Lake Lenore No. 399 invites bids for the 50 Avenue Road Rehabilitation project in the Town of Barrhead, Alberta, under contract 5450-004-00.
The scope of work includes road structure removal, waste excavation, subgrade preparation, non-woven geotextile installation, granular base, prime coat, tack coat, hot mix asphalt paving, asphalt key-in, curb and gutter replacement, monolithic sidewalk replacement, appurtenance adjustments for valves and manholes, and site restoration. Quantities include 2,585 m2 of existing road structure removal, 517 m3 of waste excavation, 2,585 m2 of 300mm subgrade preparation, 2,585 m2 of non-woven geotextile, 2,585 m2 of 300mm granular base, 2,585 m2 prime coat, 2,585 m2 tack coat, 2,585 m2 of 100mm hot mix asphalt, 3 asphalt key-ins, 6 m of rolled curb and gutter, 34 m of monolithic sidewalk with rolled curb and gutter, 3 valve appurtenance adjustments, 2 manhole appurtenance adjustments, and 1 L.S. site restoration.
REQUIRED DELIVERABLES
Remove Existing Road Structure: 2, 585 m2, Waste Excavation: 517 m3, 300mm Subgrade Preparation: 2, 585 m2, Non-Woven Geotextile: 2, 585 m2, 300mm Granular Base: 2, 585 m2, Prime Coat: 2, 585 m2, Tack Coat: 2, 585 m2, 100mm Hot Mix Asphalt: 2, 585 m2, Asphalt Key-In: 3 ea., Remove and Replace Rolled Curb and Gutter: 6 m, Remove and Replace Monolithic Sidewalk c/w Rolled Curb and Gutter: 34 m, Appurtenance Adjustment (Valve): 3 ea., Appurtenance Adjustment (Manhole): 2 ea., Site Restoration: 1 L.S.
- Submit to
- https://mpe.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/212446f3-3710-499c-a209-75b0f1c71d06
- Scope location
- Town of Barrhead, AB
Questions about this BID
How do I respond to this Bid from Rural Municipality of Lake Lenore No. 399?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is June 24, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: https://mpe.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/212446f3-3710-499c-a209-75b0f1c71d06.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Rural Municipality of Lake Lenore No. 399 in SK, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Remove Existing Road Structure: 2, 585 m2, Waste Excavation: 517 m3, 300mm Subgrade Preparation: 2, 585 m2, Non-Woven Geotextile: 2, 585 m2, 300mm Granular Base: 2, 585 m2, Prime Coat: 2, 585 m2, Tack Coat: 2, 585 m2, 100mm Hot Mix Asphalt: 2, 585 m2, Asphalt Key-In: 3 ea., Remove and Replace Rolled. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Rural Municipality of Lake Lenore No. 399?
All active and historical solicitations from Rural Municipality of Lake Lenore No. 399 are tracked and searchable. As a city agency, Rural Municipality of Lake Lenore No. 399 regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Rural Municipality of Lake Lenore No. 399 for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Town of Barrhead, AB. Review the full solicitation for detailed scope requirements.