Stockton Unified School District - Edison High School SUSD Shade Structure Project - 2022-22
- Due
- Jun 18, 2026
- Deadline passed
- Posted
- Jun 18, 2026
- Primary contact
- Leilani Gregory
- (209) 952-5850
The 30-second brief
Stockton Unified School District is seeking bids for the SUSD Shade Structure Project (Engineering Technology Building) at Edison High School, located at 100 W. Dr. Martin Luther King, Jr. Blvd., Stockton, CA 95206. The work includes selective structure demolition (Division 02), cast-in-place concrete footings, lean mix, and equipment slabs (Division 03), metal fabrications (Division 05), modified bituminous roofing over LWIC (Division 07), sheet metal flashing and trim, roof accessories, joint sealants, overhead coiling doors (Division 08), painting and finishing (Division 09), signage and graphics, toilet accessories (Division 10), equipment motor requirements, fire suppression systems (Division 21), HVAC provisions, earthwork, and exterior improvements including concrete pavement joint sealants and chain-link fencing. Project references include DSA Application No. 02-123614 and File No. 39-H7. Bids and contract documents are subject to California Building Code (CBC Title 24) and prevailing wage requirements.
Demolition and removal of selected portions of building or structure; cast-in-place concrete for footings, Lean mix concrete, And ground-mounted equipment and utility slabs-on-grade; metal fabrications; California Title 24 Cool Roof Rated SBS Modified Roof System with Cool Roof Coating; manufactured and formed sheet metal flashing and trim; roof accessories including equipment supports and pipe/conduit supports; joint sealants; insulated overhead coiling service doors; painting and finishing; accessibility signage and room capacity signs; public-use washroom accessories; fire suppression sprinkler systems; HVAC provisions; concrete paving joint sealants; chain-link fencing and gates
Price, experience, approach, references
Hear what Stockton Unified plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Stockton Unified School District is seeking bids for the SUSD Shade Structure Project (Engineering Technology Building) at Edison High School, located at 100 W. Dr.
Martin Luther King, Jr. Blvd., Stockton, CA 95206. The work includes selective structure demolition (Division 02), cast-in-place concrete footings, lean mix, and equipment slabs (Division 03), metal fabrications (Division 05), modified bituminous roofing over LWIC (Division 07), sheet metal flashing and trim, roof accessories, joint sealants, overhead coiling doors (Division 08), painting and finishing (Division 09), signage and graphics, toilet accessories (Division 10), equipment motor requirements, fire suppression systems (Division 21), HVAC provisions, earthwork, and exterior improvements including concrete pavement joint sealants and chain-link fencing. Project references include DSA Application No. 02-123614 and File No. 39-H7. Bids and contract documents are subject to California Building Code (CBC Title 24) and prevailing wage requirements.
EVALUATION CRITERIA
4- Price
- Experience
- Approach
- References
REQUIRED DELIVERABLES
15- Demolition and removal of selected portions of building or structure
- Cast-in-place concrete for footings, Lean mix concrete, And ground-mounted equipment and utility slabs-on-grade
- Metal fabrications
- California Title 24 Cool Roof Rated SBS Modified Roof System with Cool Roof Coating
- Manufactured and formed sheet metal flashing and trim
- Roof accessories including equipment supports and pipe/conduit supports
- Joint sealants
- Insulated overhead coiling service doors
- Painting and finishing
- Accessibility signage and room capacity signs
- Public-use washroom accessories
- Fire suppression sprinkler systems
- HVAC provisions
- Concrete paving joint sealants
- Chain-link fencing and gates
REQUIRED ATTACHMENTS
17- Bid Form and Proposal
- Bid Bond
- Designated Subcontractors List
- Site-Visit Certification
- Non-collusion Declaration
- Iran Contracting Act Certification
- Worker’s Compensation Certification
- Prevailing Wage and Related Labor Requirements Certification
- Disabled Veteran Business Enterprise Participation Certification
- Drug-Free Workplace Certification
- Tobacco-Free Environment Certification
- Hazardous Materials Certification
- Lead-Based Materials Certification
- Imported Materials Certification
- Criminal Background Investigation/Fingerprinting Certification
- Registered Subcontractors List
- Escrow of Bid Documentation
- Submit to
- Stockton Unified School District, Facilities Planning Department, 1944 El Pinal Drive, Stockton, CA 95205
- Scope location
- Stockton, CA
- Reported agency
- Stockton Unified School District
Questions about this BID
How do I respond to this Bid from Stockton Unified?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is June 18, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: Stockton Unified School District, Facilities Planning Department, 1944 El Pinal Drive, Stockton, CA 95205. For questions, contact Leilani Gregory.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Stockton Unified in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Leilani Gregory at (209) 952-5850. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Demolition and removal of selected portions of building or structure; cast-in-place concrete for footings, Lean mix concrete, And ground-mounted equipment and utility slabs-on-grade; metal fabrications; California Title 24 Cool Roof Rated SBS Modified Roof System with Cool Roof Coating; manufactured. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price, experience, approach, references" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Stockton Unified?
All active and historical solicitations from Stockton Unified are tracked and searchable. As a school agency, Stockton Unified regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Form and Proposal, Bid Bond, Designated Subcontractors List, Site-Visit Certification, Non-collusion Declaration, Iran Contracting Act Certification, Worker’s Compensation Certification, Prevailin. Review the full document from Stockton Unified for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Stockton, CA. Review the full solicitation for detailed scope requirements.