Soos Creek Water & Sewer District - 2026 Sewer Rehabilitation - Contract 18-2026S (2026)
Soos Creek Water And Sewer District 58Special District · Renton, WA- Due
- Aug 28, 2026
- Deadline passed
- Posted
- Aug 1, 2026
- Duration
- 4 months
- Primary contact
- Garrett Bullough
- (253) 630-7652
The 30-second brief
Soos Creek Water and Sewer District is requesting quotations for the 2026 Sewer Rehabilitation project, Contract No. 18-2026S, located in Renton and Covington, WA. The estimated bid cost range is $150,000 to $175,000. The work generally consists of rehabilitating existing gravity sewer mains identified through the District's CCTV inspection program using trenchless and localized repair methods, including cured-in-place pipe (CIPP) lining, chemical grouting, localized excavation, spot pipe repair or replacement, bypass pumping, service lateral reinstatements, traffic control, and post-rehabilitation CCTV inspections. The project involves two phases: Phase 1 for specific identified sewer main segments across multiple sites, and Phase 2 for on-call sewer rehabilitation services through December 31, 2026. Submittals are due by 1:00 PM on Friday, August 28, 2026, submitted electronically to Garrett Bullough at [email protected]. Questions must be received by August 25, 2026. Prevailing wages under RCW 39.12 and contractor certifications are required.
Site 1 Sewer Rehabilitation 010327 - 127; Site 2 Sewer Rehabilitation 121 - 122; Site 3 Sewer Rehabilitation 122 - 123; Site 4 Sewer Rehabilitation 123 - 124; Site 5 Sewer Rehabilitation 124 - 125; Site 6 Sewer Rehabilitation 074 - 073; Site 7 Sewer Rehabilitation 106 - 105; Site 8 Sewer Rehabilitation J-013 – J-014; Force Account
Lowest responsive and responsible bidder
Hear what Soos Creek Water And Sewer District 58 plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Soos Creek Water and Sewer District is requesting quotations for the 2026 Sewer Rehabilitation project, Contract No. 18-2026S, located in Renton and Covington, WA. The estimated bid cost range is $150,000 to $175,000.
The work generally consists of rehabilitating existing gravity sewer mains identified through the District's CCTV inspection program using trenchless and localized repair methods, including cured-in-place pipe (CIPP) lining, chemical grouting, localized excavation, spot pipe repair or replacement, bypass pumping, service lateral reinstatements, traffic control, and post-rehabilitation CCTV inspections. The project involves two phases: Phase 1 for specific identified sewer main segments across multiple sites, and Phase 2 for on-call sewer rehabilitation services through December 31, 2026. Submittals are due by 1:00 PM on Friday, August 28, 2026, submitted electronically to Garrett Bullough at [email protected]. Questions must be received by August 25, 2026. Prevailing wages under RCW 39.12 and contractor certifications are required.
EVALUATION CRITERIA
Lowest responsive and responsible bidder
REQUIRED DELIVERABLES
9- Site 1 Sewer Rehabilitation 010327 - 127
- Site 2 Sewer Rehabilitation 121 - 122
- Site 3 Sewer Rehabilitation 122 - 123
- Site 4 Sewer Rehabilitation 123 - 124
- Site 5 Sewer Rehabilitation 124 - 125
- Site 6 Sewer Rehabilitation 074 - 073
- Site 7 Sewer Rehabilitation 106 - 105
- Site 8 Sewer Rehabilitation J-013 – J-014
- Force Account
REQUIRED ATTACHMENTS
5- Proposal Form
- Certificate of Compliance with Wage Payment Statutes
- Contractor’s Qualification Certificate
- Non-Collusion Affidavit
- Public Bidding Crimes
- Submit to
- [email protected]
- Scope location
- Renton and Covington, WA
- Reported agency
- Soos Creek Water and Sewer District
Questions about this QUOTE
How do I respond to this Quote from Soos Creek Water And Sewer District 58?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is August 28, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact Garrett Bullough.
Can small businesses or minority-owned firms bid on this Quote?
Most government agencies, including Soos Creek Water And Sewer District 58 in WA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Quote submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Garrett Bullough at (253) 630-7652. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Site 1 Sewer Rehabilitation 010327 - 127; Site 2 Sewer Rehabilitation 121 - 122; Site 3 Sewer Rehabilitation 122 - 123; Site 4 Sewer Rehabilitation 123 - 124; Site 5 Sewer Rehabilitation 124 - 125; Site 6 Sewer Rehabilitation 074 - 073; Site 7 Sewer Rehabilitation 106 - 105; Site 8 Sewer Rehabilitat. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest responsive and responsible bidder" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Soos Creek Water And Sewer District 58?
All active and historical solicitations from Soos Creek Water And Sewer District 58 are tracked and searchable. As a special district agency, Soos Creek Water And Sewer District 58 regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 4 months. Contract terms may include renewal options.
What documents are required to bid on this Quote?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Proposal Form, Certificate of Compliance with Wage Payment Statutes, Contractor’s Qualification Certificate, Non-Collusion Affidavit, Public Bidding Crimes. Review the full document from Soos Creek Water And Sewer District 58 for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Renton and Covington, WA. Review the full solicitation for detailed scope requirements.