Pittsburg Unified School District PV Inverter Replacement Projects Structural Engineering Proposal 2026
- Due
- Jun 30, 2026
- Deadline passed
- Posted
- Jun 29, 2026
- Primary contact
- E. Keith Holtslander
The 30-second brief
BASE Design proposes structural engineering services for photovoltaic system inverter replacement across multiple Pittsburg Unified School District facilities. Services include construction documents, DSA review, and construction administration for a lump sum fee of $107,000.
Structural construction drawings, Structural calculations, Signed and sealed drawings, Site visit reports
Hear what Pittsburg Unified plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
BASE Design proposes structural engineering services for photovoltaic system inverter replacement across multiple Pittsburg Unified School District facilities. Services include construction documents, DSA review, and construction administration for a lump sum fee of $107,000.
REQUIRED DELIVERABLES
4- Structural construction drawings
- Structural calculations
- Signed and sealed drawings
- Site visit reports
REQUIRED STAFFING
Principal, Structural Consultant
- Scope location
- Pittsburg, CA
- Reported agency
- Pittsburg Unified School District
Questions about this QUOTE
How do I respond to this Quote from Pittsburg Unified?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is June 30, 2026. The solicitation specifies required deliverables that must be addressed in your response. For questions, contact E. Keith Holtslander.
Can small businesses or minority-owned firms bid on this Quote?
Most government agencies, including Pittsburg Unified in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Quote submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is E. Keith Holtslander. Questions and answers are typically shared with all prospective bidders.
What staffing is required for this project?
This solicitation outlines specific staffing requirements. The required roles include: Principal, Structural Consultant. Proposers should demonstrate relevant qualifications and experience for each required role.
What are the key deliverables?
The solicitation specifies the following deliverables: Structural construction drawings, Structural calculations, Signed and sealed drawings, Site visit reports. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Pittsburg Unified?
All active and historical solicitations from Pittsburg Unified are tracked and searchable. As a school agency, Pittsburg Unified regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Quote?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Additionally, proposals should address staffing requirements as outlined in the solicitation. Review the full document from Pittsburg Unified for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Pittsburg, CA. Review the full solicitation for detailed scope requirements.