Mississippi Dept. of Transportation - Bridge Repair - NHPP-0002-08(027) US 45 Over Norfolk Southern RR
- Due
- Sep 22, 2026
- Deadline passed
- Primary contact
- Brad White
- (601) 359-7001
The 30-second brief
Work includes bridge repair, 388 Ton loose riprap, 845 SY geotextile under riprap, removal of bridge deck, hydrodemolition, undersealing, bridge deck overlay concrete, joint repair, preformed joint seal, saw cut, general epoxy repair, cap cleaning, hybrid polymer concrete overlay, removal of asphalt pavement, removal of guard rail, removal of object markers, removal of traffic stripe, and granular material crushed stone on US 45 Over Norfolk Southern RR (Bridge #s 275.6A & 275.6B) in Alcorn, MS. The project has federal funding and is contingent upon funding not yet in place. Bids are due by September 22, 2026, at 10:00 AM.
388 Ton loose riprap, Size 100 845 SY geotextile under riprap, 632 SY removal of bridge deck, Hydrodemolition, 2, 500 Pounds undersealing, 42 CY bridge deck overlay concrete, 244 LF joint repair, 237 LF joint repair without epoxy, 247 LF preformed joint seal, Type i, 481 LF saw cut, Type i, 112 SF general epoxy repair, 6 EA cap cleaning, 588 SF bridge repair, Removal of bridge deck, 19 CY hybrid polymer concrete overlay, 281 SY removal of asphalt pavement, All depths, 470 LF removal of guard rail including post, Blockouts and hardware, 2 EA removal of object markers, 452 LF removal of traffic stripe 49 Ton granular material, Crushed stone
Hear about the next one before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Work includes bridge repair, 388 Ton loose riprap, 845 SY geotextile under riprap, removal of bridge deck, hydrodemolition, undersealing, bridge deck overlay concrete, joint repair, preformed joint seal, saw cut, general epoxy repair, cap cleaning, hybrid polymer concrete overlay, removal of asphalt pavement, removal of guard rail, removal of object markers, removal of traffic stripe, and granular material crushed stone on US 45 Over Norfolk Southern RR (Bridge #s 275.6A & 275.6B) in Alcorn, MS. The project has federal funding and is contingent upon funding not yet in place.
Bids are due by September 22, 2026, at 10:00 AM.
REQUIRED DELIVERABLES
25- 388 Ton loose riprap
- Size 100 845 SY geotextile under riprap
- 632 SY removal of bridge deck
- Hydrodemolition
- 2
- 500 Pounds undersealing
- 42 CY bridge deck overlay concrete
- 244 LF joint repair
- 237 LF joint repair without epoxy
- 247 LF preformed joint seal
- Type i
- 481 LF saw cut
- Type i
- 112 SF general epoxy repair
- 6 EA cap cleaning
- 588 SF bridge repair
- Removal of bridge deck
- 19 CY hybrid polymer concrete overlay
- 281 SY removal of asphalt pavement
- All depths
- 470 LF removal of guard rail including post
- Blockouts and hardware
- 2 EA removal of object markers
- 452 LF removal of traffic stripe 49 Ton granular material
- Crushed stone
- Submit to
- 401 N W St, Jackson, MS, 39201
- Scope location
- Alcorn, MS
Questions about this BID
How do I respond to this Bid from Mississippi Dept. of Transportation?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 22, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: 401 N W St, Jackson, MS, 39201. For questions, contact Brad White.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Mississippi Dept. of Transportation in MS, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Brad White at (601) 359-7001. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 388 Ton loose riprap, Size 100 845 SY geotextile under riprap, 632 SY removal of bridge deck, Hydrodemolition, 2, 500 Pounds undersealing, 42 CY bridge deck overlay concrete, 244 LF joint repair, 237 LF joint repair without epoxy, 247 LF preformed joint seal, Type i, 481 LF saw cut, Type i, 112 SF g. Proposals should clearly address how each deliverable will be met.
Show 2 more questions
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Mississippi Dept. of Transportation for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Alcorn, MS. Review the full solicitation for detailed scope requirements.