BIDOPEN
Save

Irrigation Systems Construction Specification Section 32 84 00

Bassett Unified logoBassett Unified
Contract term
1 year

The 30-second brief

What they're buying

This solicitation specification (Section 32 84 00) covers the furnishing, adjusting, installing, and testing of a complete operating irrigation system. The scope includes mains, laterals, risers, fittings, quick couplers, gate valves, excavation, backfill, and computerized control systems. Materials must conform to 'GREENBOOK' Standard Specifications and various ASTM standards (D1785, D2241, D2466). The project requires weather-based ET controllers, flow sensors, and specific PVC piping for potable and recycled water systems (purple pipe). Contractors must provide product data submittals within 5 days of award, maintain a 1-year guarantee, and provide 4 hours of on-site training. Testing requirements include a 2-hour hydrostatic pressure test at 150 psi.

What you must deliver

Product Data, Manufacturer installation methods, Materials and Equipment list, Shop drawings, Project Record Drawings, Operating and Maintenance Manuals, Controller Charts

Get the decision makers at Bassett Unified before you write a word.

Get decision-maker emails

Free account · 30-second setup · No credit card

Summary

This solicitation specification (Section 32 84 00) covers the furnishing, adjusting, installing, and testing of a complete operating irrigation system.

The scope includes mains, laterals, risers, fittings, quick couplers, gate valves, excavation, backfill, and computerized control systems. Materials must conform to 'GREENBOOK' Standard Specifications and various ASTM standards (D1785, D2241, D2466). The project requires weather-based ET controllers, flow sensors, and specific PVC piping for potable and recycled water systems (purple pipe). Contractors must provide product data submittals within 5 days of award, maintain a 1-year guarantee, and provide 4 hours of on-site training. Testing requirements include a 2-hour hydrostatic pressure test at 150 psi.

REQUIRED DELIVERABLES

7
  • Product Data
  • Manufacturer installation methods
  • Materials and Equipment list
  • Shop drawings
  • Project Record Drawings
  • Operating and Maintenance Manuals
  • Controller Charts

REQUIRED ATTACHMENTS

3
  • Irrigation Plan
  • Irrigation Legend
  • Irrigation Details

REQUIRED STAFFING

superintendent, foreman

Reported agency
Public Works Department

Questions about this BID

How do I respond to this Bid from Bassett Unified?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including Bassett Unified in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

What staffing is required for this project?

This solicitation outlines specific staffing requirements. The required roles include: superintendent, foreman. Proposers should demonstrate relevant qualifications and experience for each required role.

What are the key deliverables?

The solicitation specifies the following deliverables: Product Data, Manufacturer installation methods, Materials and Equipment list, Shop drawings, Project Record Drawings, Operating and Maintenance Manuals, Controller Charts. Proposals should clearly address how each deliverable will be met.

Show 3 more questions

Where can I find more RFPs from Bassett Unified?

All active and historical solicitations from Bassett Unified are tracked and searchable. As a school agency, Bassett Unified regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What is the contract term for this solicitation?

The anticipated contract term is 1 year. Contract terms may include renewal options.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Irrigation Plan, Irrigation Legend, Irrigation Details. Additionally, proposals should address staffing requirements as outlined in the solicitation. Review the full document from Bassett Unified for the complete list.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required