Energy & Environmental Protection - Seymour No. 4 Dam Improvements - ITB DEEP090126CM (2026)
Connecticut Department of Energy and Environmental ProtectionState · Hartford, CT- Due
- Oct 6, 2026
- Deadline passed
- Posted
- Sep 1, 2026
- Primary contact
- James Heaven
Hear what Connecticut Department of Energy and Environmental Protection plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Replace the existing spillway with a concrete drop inlet structure with 48-inch discharge pipe and energy dissipator at the downstream end.
A new 16-inch outlet pipe controlled by a stainless steel slide gate will be installed in the drop inlet spillway structure. Installation of a new valve and extension stem on the existing low level outlet upstream of the dam at the bottom of the reservoir. Trees will be cleared from the embankments and the downstream slope will be filled in the vicinity of the new spillway discharge pipe and energy dissipator. Eroded areas on the crest will be repaired, the crest will be raised one foot. Riprap will be placed on the upstream slope. Construction of a 100-foot long auxiliary spillway with concrete core wall. Clear trees and stumps from left dike, topsoil and seed with grass.
- Submit to
- [email protected]
- Reported agency
- Energy & Environmental Protection
Questions about this BID
How do I respond to this Bid from Connecticut Department of Energy and Environmental Protection?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 6, 2026. Submissions should be delivered to: [email protected]. For questions, contact James Heaven.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Connecticut Department of Energy and Environmental Protection in CT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is James Heaven. Questions and answers are typically shared with all prospective bidders.
Show 2 more questions
Where can I find more RFPs from Connecticut Department of Energy and Environmental Protection?
All active and historical solicitations from Connecticut Department of Energy and Environmental Protection are tracked and searchable. As a state agency, Connecticut Department of Energy and Environmental Protection regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Connecticut Department of Energy and Environmental Protection for the complete list.