El Paso Water, El Paso, TX·Utility District
Track El Paso Water solicitations
Get alerted when El Paso Water posts a new RFP, and see the pre-RFP signals months before it publishes.
PCL/Sundt JV is soliciting DBE, SLBE, MBE, WBE, and OBE contractors to submit proposals for the Haskell R. Street Wastewater Treatment Plant Grit Removal System Improvements Bid Package for El Paso Water in El Paso Texas. Proposal due date is July 14, 2025 at 2:00 PM (MT). The project includes demolition of an existing aerated grit facility and dewatering facility, abandoning a 60-inch raw sewage line, and construction of a new grit removal facility, grit dewatering facility, odor control, site improvements, and electrical improvements. Additional work encompasses concrete reinforcements, concrete finishing, precast concrete, grout supplement, concrete repair, structural steel, metal fabrications, metal stairs, building insulation, roofing, joint sealants, steel doors and frames, finishes, plumbing, HVAC, electrical, earthwork, exterior improvements, utilities, and water and wastewater equipment.
Common questions about this solicitation, answered from the record.
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is July 14, 2025. Submissions should be delivered to: https://securecc.smartinsight.co/#/PublicBidProject/807981. For questions, contact Andrea Chavez.
All active and historical solicitations from El Paso Water are tracked and searchable. As a utility district agency, El Paso Water regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from El Paso Water for the complete list.
Most government agencies, including El Paso Water in TX, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Andrea Chavez at (480) 763-2743. Questions and answers are typically shared with all prospective bidders.
This solicitation defines a specific project scope. The scope covers the following locations: El Paso, TX. Review the full solicitation for detailed scope requirements.
B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.
Other solicitations from El Paso Water.