Dorchester School District Two Gregg Middle School Partial Roof Replacement and Exterior Wall Remediation - R25CHS-064
- Due
- Jan 16, 2026
- Deadline passed
- Posted
- Jan 16, 2026
The 30-second brief
Dorchester School District Two is soliciting bids for partial roof replacement and exterior wall remediation at Gregg Middle School located at 500 Greenwave Blvd, Summerville, SC. The project includes multiple buildings and specific technical details for roofing systems and masonry repointing.
Roofing installation, Exterior wall remediation, Masonry repointing, Sealant application
Get notified when Dorchester School District 2 posts the next one.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Dorchester School District Two is soliciting bids for partial roof replacement and exterior wall remediation at Gregg Middle School located at 500 Greenwave Blvd, Summerville, SC. The project includes multiple buildings and specific technical details for roofing systems and masonry repointing.
REQUIRED DELIVERABLES
4- Roofing installation
- Exterior wall remediation
- Masonry repointing
- Sealant application
REQUIRED ATTACHMENTS
5- Drawing Index
- Building Code Reference
- Abbreviation List
- Site Plan
- Vicinity Map
- Scope location
- Summerville, SC
- Reported agency
- Dorchester School District Two
Questions about this BID
How do I respond to this Bid from Dorchester School District 2?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is January 16, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Dorchester School District 2 in SC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Roofing installation, Exterior wall remediation, Masonry repointing, Sealant application. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from Dorchester School District 2?
All active and historical solicitations from Dorchester School District 2 are tracked and searchable. As a school agency, Dorchester School District 2 regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Drawing Index, Building Code Reference, Abbreviation List, Site Plan, Vicinity Map. Review the full document from Dorchester School District 2 for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Summerville, SC. Review the full solicitation for detailed scope requirements.