BIDCLOSED
Save

District of Maple Ridge Tender 26-012 Reservoir Replacement 270A Street

District of Maple Ridge logoDistrict of Maple Ridge
Due
Mar 25, 2026
Deadline passed
Posted
Feb 3, 2026

The 30-second brief

What they're buying

The District of Maple Ridge invites tenders from general contractors prequalified through 25-094 Reservoir Upgrades Prequalification for the 270A St Pump Station - Reservoir Expansion Project. The work generally consists of the supply and installation of a new 1.6 ML glass-fused-to-steel bolted potable water storage tank, associated water main, a new PRV and flow metering chamber in a pre-cast concrete vault, a tank drain box manhole with an HS-20 rated access hatch, stormwater piping and valves, site grading, and startup, testing, and commissioning. Demolition includes an existing bolted steel reservoir and an old decommissioned pump station building and standby generator. The submission deadline is March 25, 2026.

What you must deliver

Supply and installation of a new (second) 1.6 ML glass-fused-to-steel bolted potable water storage tank and associated water main; Installation of a new PRV and flow metering chamber in a pre-cast concrete vault and associated water main and tie-ins; Installation of a new tank drain box manhole with an HS-20 rated access hatch and associated stormwater piping and valves; Demolition of an existing bolted steel reservoir; Demolition of an old decommissioned pump station building and standby generator; Site grading; Startup, Testing and commissioning of new and relocated equipment

Hear what District of Maple Ridge plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

The District of Maple Ridge invites tenders from general contractors prequalified through 25-094 Reservoir Upgrades Prequalification for the 270A St Pump Station - Reservoir Expansion Project.

The work generally consists of the supply and installation of a new 1.6 ML glass-fused-to-steel bolted potable water storage tank, associated water main, a new PRV and flow metering chamber in a pre-cast concrete vault, a tank drain box manhole with an HS-20 rated access hatch, stormwater piping and valves, site grading, and startup, testing, and commissioning. Demolition includes an existing bolted steel reservoir and an old decommissioned pump station building and standby generator. The submission deadline is March 25, 2026.

REQUIRED DELIVERABLES

7
  • Supply and installation of a new (second) 1.6 ML glass-fused-to-steel bolted potable water storage tank and associated water main
  • Installation of a new PRV and flow metering chamber in a pre-cast concrete vault and associated water main and tie-ins
  • Installation of a new tank drain box manhole with an HS-20 rated access hatch and associated stormwater piping and valves
  • Demolition of an existing bolted steel reservoir
  • Demolition of an old decommissioned pump station building and standby generator
  • Site grading
  • Startup, Testing and commissioning of new and relocated equipment
Submit to
https://mapleridge.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/a3dc6b4d-5581-4626-8771-c3665a0d6f6b
Scope location
Public

Questions about this BID

How do I respond to this Bid from District of Maple Ridge?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is March 25, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: https://mapleridge.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/a3dc6b4d-5581-4626-8771-c3665a0d6f6b.

Can small businesses or minority-owned firms bid on this Bid?

Most government agencies, including District of Maple Ridge in BC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the Bid submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

What are the key deliverables?

The solicitation specifies the following deliverables: Supply and installation of a new (second) 1.6 ML glass-fused-to-steel bolted potable water storage tank and associated water main; Installation of a new PRV and flow metering chamber in a pre-cast concrete vault and associated water main and tie-ins; Installation of a new tank drain box manhole with. Proposals should clearly address how each deliverable will be met.

Show 3 more questions

Where can I find more RFPs from District of Maple Ridge?

All active and historical solicitations from District of Maple Ridge are tracked and searchable. As a city agency, District of Maple Ridge regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this Bid?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from District of Maple Ridge for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Public. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required