Connecticut Airport Authority Fuel Tank & Oil/Water Separator Improvements - GON IFB No. 2026-014 (2026)
- Due
- Apr 30, 2026
- Deadline passed
- Posted
- Mar 26, 2026
- Duration
- 3 months
- Primary contact
- Kevin Lynch
Hear what Connecticut Airport Authority plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The project consists of the removal and disposal of one 4,000-gallon single wall fiberglass reinforced concrete underground fuel oil tank in front of the airport terminal building, including the installation of a temporary 2,000-gallon rectangular aboveground fuel oil tank with connections to the terminal building's existing boiler system.
The project also includes the removal, disposal, and replacement of a 1,000-gallon oil/water separator at the airport's maintenance facility. The contract time for completion of all work is within one hundred calendar days from the date specified in the Notice to Proceed. Submissions are due by April 30, 2026.
- Submit to
- [email protected]
- Scope location
- Windsor Locks, CT
Questions about this IFB
How do I respond to this IFB from Connecticut Airport Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is April 30, 2026. Submissions should be delivered to: [email protected]. For questions, contact Kevin Lynch.
Can small businesses or minority-owned firms bid on this IFB?
Most government agencies, including Connecticut Airport Authority in CT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the IFB submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Kevin Lynch. Questions and answers are typically shared with all prospective bidders.
Show 4 more questions
Where can I find more RFPs from Connecticut Airport Authority?
All active and historical solicitations from Connecticut Airport Authority are tracked and searchable. As a airport authority agency, Connecticut Airport Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 3 months. Contract terms may include renewal options.
What documents are required to bid on this IFB?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Connecticut Airport Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Windsor Locks, CT. Review the full solicitation for detailed scope requirements.