The 30-second brief
Construction of a new sanitary sewer mainline from the Teton River Temple to the wastewater treatment plant under Project # SWR-01-26 for the City of Rexburg, Idaho. The project includes gravity sewer pipe (8" to 18" SDR 35), trenching, bedding, backfill, trench dewatering, adjusting manholes, manhole installation, 30" corrugated metal pipe, pressure sewer pipe C900, boring under the Teton River crossing with steel casing and HDPE pressure pipe, and a sanitary sewer detention lift station (wet well, 3 pumps, mechanical and electrical, lift station dewatering, Rocky Mountain Power service). Street construction on Moody Rd and Moran Rd includes excavation, asphalt removal, geotextile fabric, granular borrow, crushed aggregate base, asphalt surface course plant mix, and soft spot repair, alongside traffic control and mobilization. Bids are due by February 17, 2026 at 3:00 P.M. at Rexburg City Hall, 35 North 1st East, Rexburg, ID 83440.
Gravity Sewer Pipe - 8" SDR 35, Gravity Sewer Pipe - 10" SDR 35, Gravity Sewer Pipe - 12" SDR 35, Gravity Sewer Pipe - 15" SDR 35, Gravity Sewer Pipe - 18" SDR 35, Gravity Sewer Trench Dewatering, Adjust Manholes to Grade, 48" Sanitary Sewer Manhole Type A, Pressure Sewer Pipe - C900, Pressure Sewer Trench Dewatering, Boring under Teton River Crossing (Including 16" I.D. Steel Casing 3/8", 8" DR17 HDPE Pressure Pipe), Sanitary Sewer Detention Lift Station (Wet Well, 3 Pumps, Valve vault, Pipe connection, Etc), Sanitary Sewer Detention Lift Station Mechanical, Sanitary Sewer Detention Lift Station Electrical, Lift Station Dewatering, Rocky Mountain Power Service, Excavation/Asphalt Removal, Geo Textile Fabric, 18" Granular Borrow, 4" of 3/4" Minus Crushed Aggr. Base, 3" Asphalt Surface Course Plant Mix (145 pcf), Soft Spot Repair, Traffic Control, Mobilization/Bonds
Hear what Rexburg plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
Construction of a new sanitary sewer mainline from the Teton River Temple to the wastewater treatment plant under Project # SWR-01-26 for the City of Rexburg, Idaho.
The project includes gravity sewer pipe (8" to 18" SDR 35), trenching, bedding, backfill, trench dewatering, adjusting manholes, manhole installation, 30" corrugated metal pipe, pressure sewer pipe C900, boring under the Teton River crossing with steel casing and HDPE pressure pipe, and a sanitary sewer detention lift station (wet well, 3 pumps, mechanical and electrical, lift station dewatering, Rocky Mountain Power service). Street construction on Moody Rd and Moran Rd includes excavation, asphalt removal, geotextile fabric, granular borrow, crushed aggregate base, asphalt surface course plant mix, and soft spot repair, alongside traffic control and mobilization. Bids are due by February 17, 2026 at 3:00 P.M. at Rexburg City Hall, 35 North 1st East, Rexburg, ID 83440.
REQUIRED DELIVERABLES
Gravity Sewer Pipe - 8" SDR 35, Gravity Sewer Pipe - 10" SDR 35, Gravity Sewer Pipe - 12" SDR 35, Gravity Sewer Pipe - 15" SDR 35, Gravity Sewer Pipe - 18" SDR 35, Gravity Sewer Trench Dewatering, Adjust Manholes to Grade, 48" Sanitary Sewer Manhole Type A, Pressure Sewer Pipe - C900, Pressure Sewer Trench Dewatering, Boring under Teton River Crossing (Including 16" I.D. Steel Casing 3/8", 8" DR17 HDPE Pressure Pipe), Sanitary Sewer Detention Lift Station (Wet Well, 3 Pumps, Valve vault, Pipe connection, Etc), Sanitary Sewer Detention Lift Station Mechanical, Sanitary Sewer Detention Lift Station Electrical, Lift Station Dewatering, Rocky Mountain Power Service, Excavation/Asphalt Removal, Geo Textile Fabric, 18" Granular Borrow, 4" of 3/4" Minus Crushed Aggr. Base, 3" Asphalt Surface Course Plant Mix (145 pcf), Soft Spot Repair, Traffic Control, Mobilization/Bonds
REQUIRED ATTACHMENTS
5- Proposal
- Bid Bond
- Performance Bond
- Payment Bond
- Certificate of Insurance
- Submit to
- http://rexburg.org/page/rfps
- Scope location
- Rexburg, ID
Questions about this BID
How do I respond to this Bid from City of Rexburg?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is February 17, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: http://rexburg.org/page/rfps. For questions, contact Brett McDermott.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Rexburg in ID, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Brett McDermott. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Gravity Sewer Pipe - 8" SDR 35, Gravity Sewer Pipe - 10" SDR 35, Gravity Sewer Pipe - 12" SDR 35, Gravity Sewer Pipe - 15" SDR 35, Gravity Sewer Pipe - 18" SDR 35, Gravity Sewer Trench Dewatering, Adjust Manholes to Grade, 48" Sanitary Sewer Manhole Type A, Pressure Sewer Pipe - C900, Pressure Sewer. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from City of Rexburg?
All active and historical solicitations from City of Rexburg are tracked and searchable. As a city agency, City of Rexburg regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 7 months. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Proposal, Bid Bond, Performance Bond, Payment Bond, Certificate of Insurance. Review the full document from City of Rexburg for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Rexburg, ID. Review the full solicitation for detailed scope requirements.