City of Byron Advertisement for Bid - Manchester Subdivision Storm Drainage Improvements PE-66972-NONST-2026-000000010
City of ByronCity · Byron, GA- Due
- May 28, 2026
- Deadline passed
- Posted
- Apr 29, 2026
- Primary contact
- William Jones
- (706) 765-8767
The 30-second brief
The City of Byron is seeking bids for the construction of the Manchester Place Subdivision Stormwater Improvements under solicitation PE-66972-NONST-2026-000000010. The scope of work includes erosion and sedimentation control, clearing and grading, drainage installation, demolition of existing improvements, and site restoration. Major storm drainage piping includes 20 LF of 72-inch RCP, 20 LF of temporary 54-inch RCP culvert, 3,438 LF of 36-inch ADS HP storm pipe, 126 LF of 18-inch ADS HP storm pipe, and 1,298 LF of 18-inch HDPE along with associated headwalls, inlets, manholes, and outlet control structures. Bids are due by May 28, 2026, at 10:00 a.m. at the Byron Municipal Complex in Byron, GA. A non-mandatory pre-bid meeting is scheduled for May 14, 2026. Substantial completion is allotted 240 days, with final completion in 270 calendar days from the Notice to Proceed.
20 LF of 72-inch RCP, 20 LF of temporary 54-inch RCP (culvert), 3, 438 LF of 36-inch ADS HP storm pipe, 126 LF of 18-inch ADS HP storm pipe, 1, 298 LF of 18-inch HDPE, Headwalls, Inlets, Manholes, Outlet control structure
Hear what Byron plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The City of Byron is seeking bids for the construction of the Manchester Place Subdivision Stormwater Improvements under solicitation PE-66972-NONST-2026-000000010.
The scope of work includes erosion and sedimentation control, clearing and grading, drainage installation, demolition of existing improvements, and site restoration. Major storm drainage piping includes 20 LF of 72-inch RCP, 20 LF of temporary 54-inch RCP culvert, 3,438 LF of 36-inch ADS HP storm pipe, 126 LF of 18-inch ADS HP storm pipe, and 1,298 LF of 18-inch HDPE along with associated headwalls, inlets, manholes, and outlet control structures. Bids are due by May 28, 2026, at 10:00 a.m. at the Byron Municipal Complex in Byron, GA. A non-mandatory pre-bid meeting is scheduled for May 14, 2026. Substantial completion is allotted 240 days, with final completion in 270 calendar days from the Notice to Proceed.
REQUIRED DELIVERABLES
11- 20 LF of 72-inch RCP
- 20 LF of temporary 54-inch RCP (culvert)
- 3
- 438 LF of 36-inch ADS HP storm pipe
- 126 LF of 18-inch ADS HP storm pipe
- 1
- 298 LF of 18-inch HDPE
- Headwalls
- Inlets
- Manholes
- Outlet control structure
REQUIRED ATTACHMENTS
4- Bid Bond
- Performance Bond
- Payment Bond
- Digital Bid Forms
- Submit to
- [email protected]
- Scope location
- Byron, GA
Questions about this BID
How do I respond to this Bid from City of Byron?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is May 28, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact William Jones.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Byron in GA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is William Jones at (706) 765-8767. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: 20 LF of 72-inch RCP, 20 LF of temporary 54-inch RCP (culvert), 3, 438 LF of 36-inch ADS HP storm pipe, 126 LF of 18-inch ADS HP storm pipe, 1, 298 LF of 18-inch HDPE, Headwalls, Inlets, Manholes, Outlet control structure. Proposals should clearly address how each deliverable will be met.
Show 3 more questions
Where can I find more RFPs from City of Byron?
All active and historical solicitations from City of Byron are tracked and searchable. As a city agency, City of Byron regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Bond, Performance Bond, Payment Bond, Digital Bid Forms. Review the full document from City of Byron for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Byron, GA. Review the full solicitation for detailed scope requirements.