City of Bridgeport - McGrath House Kitchen Renovations - CGB02027B (2026)
- Due
- Nov 4, 2026
- 6 days left
- Posted
- Oct 5, 2026
- Primary contact
- Kevin McKenzie
- (203) 576-8144
The 30-second brief
The City of Bridgeport seeks bids for kitchen renovations and gas boiler replacement at McGrath House, located at 465, 467 & 469 Summit St, units 1, 2 and 3. The work includes the replacement of kitchen cabinets using Hampton Bay Shaker White wood cabinets, bullnose countertops, 30-inch ducted wall-mount range hoods, 2-foot x 2-foot integrated LED panel lights, moisture-barrier underlayment, and Grip Strip water-resistant luxury vinyl plank flooring, alongside one 100,000 BTU GWA 100-N-S3 gas boiler replacement in the basement boiler room. Electronic submissions will be received through the OpenGov e-Procurement Portal until 2:00 pm on Wednesday, November 4, 2026. A mandatory pre-bid meeting/walk-thru is scheduled for Tuesday, October 13, 2026, at 10:00 am at the site. The cut-off time for questions is 4:00 pm on Wednesday, October 21, 2026. Bidders must provide a 10% bid bond for bids of $100,000 or more, comply with Davis-Bacon prevailing wage rates, and possess a valid Connecticut contractor license.
BOILER REPLACEMENT, 1ST FLOOR KITCHEN, 2ND FLOOR KITCHEN, 3RD FLOOR KITCHEN
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The City of Bridgeport seeks bids for kitchen renovations and gas boiler replacement at McGrath House, located at 465, 467 & 469 Summit St, units 1, 2 and 3.
The work includes the replacement of kitchen cabinets using Hampton Bay Shaker White wood cabinets, bullnose countertops, 30-inch ducted wall-mount range hoods, 2-foot x 2-foot integrated LED panel lights, moisture-barrier underlayment, and Grip Strip water-resistant luxury vinyl plank flooring, alongside one 100,000 BTU GWA 100-N-S3 gas boiler replacement in the basement boiler room. Electronic submissions will be received through the OpenGov e-Procurement Portal until 2:00 pm on Wednesday, November 4, 2026. A mandatory pre-bid meeting/walk-thru is scheduled for Tuesday, October 13, 2026, at 10:00 am at the site. The cut-off time for questions is 4:00 pm on Wednesday, October 21, 2026. Bidders must provide a 10% bid bond for bids of $100,000 or more, comply with Davis-Bacon prevailing wage rates, and possess a valid Connecticut contractor license.
REQUIRED DELIVERABLES
4- BOILER REPLACEMENT
- 1ST FLOOR KITCHEN
- 2ND FLOOR KITCHEN
- 3RD FLOOR KITCHEN
REQUIRED ATTACHMENTS
9- Bid Bond
- Certificate of Insurance
- No Conflicts-Disclosure Form
- Non-Collusion Affidavit
- Contractor's Designation of Compliance Officer
- Contractor's Good Standing Certification
- Contractor's Davis-Bacon Wage Rate Certification Form
- Equal Opportunity Policy Statement
- McGrath House Schedule of Work
- Submit to
- https://procurement.opengov.com/portal/bridgeportct
- Scope location
- Bridgeport, CT
Questions about this BID
How do I respond to this Bid from City of Bridgeport?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 4, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: https://procurement.opengov.com/portal/bridgeportct. For questions, contact Kevin McKenzie.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including City of Bridgeport in CT, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Kevin McKenzie at (203) 576-8144. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: BOILER REPLACEMENT, 1ST FLOOR KITCHEN, 2ND FLOOR KITCHEN, 3RD FLOOR KITCHEN. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from City of Bridgeport?
All active and historical solicitations from City of Bridgeport are tracked and searchable. As a city agency, City of Bridgeport regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 4, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Bid Bond, Certificate of Insurance, No Conflicts-Disclosure Form, Non-Collusion Affidavit, Contractor's Designation of Compliance Officer, Contractor's Good Standing Certification, Contractor's Davis-. Review the full document from City of Bridgeport for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Bridgeport, CT. Review the full solicitation for detailed scope requirements.