The 30-second brief

What they're buying

The City of Belton is seeking proposals for the Fire Department HVAC Replacement project under RFP 26-029. The scope of work includes the removal and haul away of one existing 7.5-ton rooftop unit, and furnishing and installing a new 7.5-ton rooftop unit with associated manufacturer recommendations, rigging, gas piping, electrical connections, and plumbing for a continuous condensation drain line. Additional requirements involve startup and return to normal operations, curb and ductwork rework, and qualified roofing contractor services if needed. Bidders must be City-licensed and insured, with permits and inspections required. Submissions are due by September 24, 2026, at 10:00 a.m. local time, to be delivered or mailed in a sealed envelope to the Belton Fire Department.

What you must deliver

Remove and haul away one (1) existing 7.5-ton rooftop unit, Furnish and install one 7.5-ton rooftop unit, Provide rigging, Provide materials to re-connect gas piping and electrical, Provide plumbing and install a continuous drain line, Perform startup and return to normal operations, Rework curb and ductwork, Provide qualified roofing contractor

Hear what Belton plans next before it's posted.

Get alerts free

Free account · 30-second setup · No credit card

Summary

The City of Belton is seeking proposals for the Fire Department HVAC Replacement project under RFP 26-029.

The scope of work includes the removal and haul away of one existing 7.5-ton rooftop unit, and furnishing and installing a new 7.5-ton rooftop unit with associated manufacturer recommendations, rigging, gas piping, electrical connections, and plumbing for a continuous condensation drain line. Additional requirements involve startup and return to normal operations, curb and ductwork rework, and qualified roofing contractor services if needed. Bidders must be City-licensed and insured, with permits and inspections required. Submissions are due by September 24, 2026, at 10:00 a.m. local time, to be delivered or mailed in a sealed envelope to the Belton Fire Department.

REQUIRED DELIVERABLES

8
  • Remove and haul away one (1) existing 7.5-ton rooftop unit
  • Furnish and install one 7.5-ton rooftop unit
  • Provide rigging
  • Provide materials to re-connect gas piping and electrical
  • Provide plumbing and install a continuous drain line
  • Perform startup and return to normal operations
  • Rework curb and ductwork
  • Provide qualified roofing contractor
Submit to
Belton Fire Department, Attn: Battalion Chief Todd Yohe, 16300 N Mullen Rd., Belton, MO 64012
Scope location
Belton, MO

Questions about this RFP

How do I respond to this RFP from City of Belton?

Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is September 24, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: Belton Fire Department, Attn: Battalion Chief Todd Yohe, 16300 N Mullen Rd., Belton, MO 64012. For questions, contact Todd Yohe.

Can small businesses or minority-owned firms bid on this RFP?

Most government agencies, including City of Belton in MO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.

What happens after the RFP submission deadline?

After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.

Can I ask questions about this solicitation before submitting?

Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Todd Yohe at (816) 695-5509. Questions and answers are typically shared with all prospective bidders.

What are the key deliverables?

The solicitation specifies the following deliverables: Remove and haul away one (1) existing 7.5-ton rooftop unit, Furnish and install one 7.5-ton rooftop unit, Provide rigging, Provide materials to re-connect gas piping and electrical, Provide plumbing and install a continuous drain line, Perform startup and return to normal operations, Rework curb and. Proposals should clearly address how each deliverable will be met.

Show 3 more questions

Where can I find more RFPs from City of Belton?

All active and historical solicitations from City of Belton are tracked and searchable. As a city agency, City of Belton regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.

What documents are required to bid on this RFP?

Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from City of Belton for the complete list.

What is the scope of this project?

This solicitation defines a specific project scope. The scope covers the following locations: Belton, MO. Review the full solicitation for detailed scope requirements.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required