Chino Valley Unified School District - Kindergarten Tree Planting Project at Various Elementary School Sites - 2026
- Contract term
- 1 year
The 30-second brief
Chino Valley Unified School District is accepting bids for the purchasing and planting of trees in kindergarten areas at various elementary school sites across Chino, Chino Hills, and Ontario. The scope of work includes pre-planting ground preparation, tree installation, watering basins, 3 stakes, ties, dedicated irrigation valves and lateral lines, low volume drip emitters, artificial turf removal and reinstallation with weed barrier fabric, native soil backfilling, green waste reporting in compliance with AB 939, and structural pruning services 3 times per year for 1 year. The estimated construction cost is $125,000.00 with a contractor duration of 90 calendar days. Work must comply with International Society of Arboriculture Best Management Practices and ANSI A300, Z60.1-2001, and Z133.1-1994 standards.
Purchasing and planting of 36" box trees including Coast Live Oak, Magnolia Grandiflora, Brisbane, Carrotwood, And Arbutus Marina Strawberry across various elementary school sites; installation of watering basins, 3 stakes, And ties; installation of Rain Bird valves and low volume drip emitters; artificial turf removal and reinstallation with weed barrier fabric; dedicated irrigation valve and lateral line installation
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Chino Valley Unified School District is accepting bids for the purchasing and planting of trees in kindergarten areas at various elementary school sites across Chino, Chino Hills, and Ontario.
The scope of work includes pre-planting ground preparation, tree installation, watering basins, 3 stakes, ties, dedicated irrigation valves and lateral lines, low volume drip emitters, artificial turf removal and reinstallation with weed barrier fabric, native soil backfilling, green waste reporting in compliance with AB 939, and structural pruning services 3 times per year for 1 year. The estimated construction cost is $125,000.00 with a contractor duration of 90 calendar days. Work must comply with International Society of Arboriculture Best Management Practices and ANSI A300, Z60.1-2001, and Z133.1-1994 standards.
REQUIRED DELIVERABLES
Purchasing and planting of 36" box trees including Coast Live Oak, Magnolia Grandiflora, Brisbane, Carrotwood, And Arbutus Marina Strawberry across various elementary school sites; installation of watering basins, 3 stakes, And ties; installation of Rain Bird valves and low volume drip emitters; artificial turf removal and reinstallation with weed barrier fabric; dedicated irrigation valve and lateral line installation
- Duration
- 3 months
- Scope location
- Chino, CA
- Reported agency
- Chino Valley Unified School District
Questions about this BID
How do I respond to this Bid from Chino Valley Unified?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The solicitation specifies required deliverables that must be addressed in your response.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Chino Valley Unified in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
What are the key deliverables?
The solicitation specifies the following deliverables: Purchasing and planting of 36" box trees including Coast Live Oak, Magnolia Grandiflora, Brisbane, Carrotwood, And Arbutus Marina Strawberry across various elementary school sites; installation of watering basins, 3 stakes, And ties; installation of Rain Bird valves and low volume drip emitters; art. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from Chino Valley Unified?
All active and historical solicitations from Chino Valley Unified are tracked and searchable. As a school agency, Chino Valley Unified regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 1 year. Contract terms may include renewal options.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Chino Valley Unified for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Chino, CA. Review the full solicitation for detailed scope requirements.