Carmichael Water District Kenneth Avenue, Boyd, Melvin, & Vale Dr Transmission Line Replacement Project RFP
- Due
- Dec 23, 2025
- Deadline passed
- Posted
- Nov 19, 2025
- Primary contact
- Greg Norris
- (916) 483-2452
Hear what Carmichael Water District plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Carmichael Water District is soliciting proposals for professional engineering services for the Garfield Transmission Line Replacement Project.
The project scope includes three main segments: Kenneth Avenue/Carmichael Way (2,700 feet of ductile iron pipe, 4 fire hydrants, 32 service reconnections), Boyd and Melvin Drives (1,200 feet of ductile iron water main, 2 fire hydrants, 47 service reconnections), and Vale Drive (1,000 feet of ductile iron pipe, 1 fire hydrant, 23 service reconnections). Work also includes tie-in connections to the existing water system. Proposals are due by December 23, 2025, at 12:00 p.m. at the District office in Carmichael, CA. The selection will be based on criteria described in the full RFP document.
REQUIRED STAFFING
Engineering Manager
- Submit to
- 7837 Fair Oaks Boulevard, Carmichael, California 95608
- Scope location
- Carmichael, CA
Questions about this RFP
How do I respond to this RFP from Carmichael Water District?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 23, 2025. Submissions should be delivered to: 7837 Fair Oaks Boulevard, Carmichael, California 95608. For questions, contact Greg Norris.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Carmichael Water District in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Greg Norris at (916) 483-2452. Questions and answers are typically shared with all prospective bidders.
What staffing is required for this project?
This solicitation outlines specific staffing requirements. The required roles include: Engineering Manager. Proposers should demonstrate relevant qualifications and experience for each required role.
Show 3 more questions
Where can I find more RFPs from Carmichael Water District?
All active and historical solicitations from Carmichael Water District are tracked and searchable. As a utility district agency, Carmichael Water District regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Additionally, proposals should address staffing requirements as outlined in the solicitation. Review the full document from Carmichael Water District for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Carmichael, CA. Review the full solicitation for detailed scope requirements.