Blaine County School District No. 61 - Hailey Elementary School Replacement Project CM/GC Services - 2026
- Due
- Nov 9, 2026
- 6 days left
- Posted
- Oct 16, 2026
- Primary contact
- Kian Ahmadian
- (555) 123-4567 ext 101
The 30-second brief
Blaine County School District No. 61 invites Statements of Qualifications from licensed firms to provide Construction Manager / General Contractor (CM/GC) services for the Hailey Elementary School Replacement Project in Hailey, Idaho. The project involves building a new approximately 60,000 square foot, two-story elementary school for approximately 450 students on the existing 14.21-acre campus located at Elm Street and 3rd Avenue South, while the existing school remains occupied and fully operating during construction. Services include preconstruction participation, constructability and value reviews, schedule and site logistics development, bidding and Guaranteed Maximum Price (GMP) proposal, general contractor services, and management of an occupied campus transition. Submission deadline is November 9, 2026, at 2:00 p.m. Mountain Time. Selection is based on qualifications only, utilizing a 100-point rubric with no pricing accepted at this stage.
Firm Qualifications and Capacity (10 points), Relevant Project Experience (20 points), Project Team and Key Personnel (20 points), Preconstruction Approach (15 points), Construction Approach on an Occupied Campus (15 points), Local Knowledge and Trade Partner Strategy (10 points), Safety and Quality (5 points), References and Past Performance (5 points)
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Blaine County School District No. 61 invites Statements of Qualifications from licensed firms to provide Construction Manager / General Contractor (CM/GC) services for the Hailey Elementary School Replacement Project in Hailey, Idaho.
The project involves building a new approximately 60,000 square foot, two-story elementary school for approximately 450 students on the existing 14.21-acre campus located at Elm Street and 3rd Avenue South, while the existing school remains occupied and fully operating during construction. Services include preconstruction participation, constructability and value reviews, schedule and site logistics development, bidding and Guaranteed Maximum Price (GMP) proposal, general contractor services, and management of an occupied campus transition. Submission deadline is November 9, 2026, at 2:00 p.m. Mountain Time. Selection is based on qualifications only, utilizing a 100-point rubric with no pricing accepted at this stage.
EVALUATION CRITERIA
REQUIRED ATTACHMENTS
10- Attachment A: Proposer Certification Form
- Idaho construction manager license and certificate of authority
- Idaho public works contractor license
- Surety letter
- Certificate of insurance
- Disclosure of any litigation
- Arbitration
- Claims
- Terminations
- Defaults or assessed liquidated damages in the last five years
- Submit to
- [email protected]
- Scope location
- Hailey, ID
- Projected sq ft
- 60,000 sq ft
- Reported agency
- Blaine County School District No. 61
Questions about this RFQ
How do I respond to this RFQ from Blaine County School District 61?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 9, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: [email protected]. For questions, contact Kian Ahmadian.
Can small businesses or minority-owned firms bid on this RFQ?
Most government agencies, including Blaine County School District 61 in ID, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFQ submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Kian Ahmadian at (555) 123-4567 ext 101. Questions and answers are typically shared with all prospective bidders.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Firm Qualifications and Capacity (10 points), Relevant Project Experience (20 points), Project Team and Key Personnel (20 points), Preconstruction Approach (15 points), Construction Approach on an Occ..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Blaine County School District 61?
All active and historical solicitations from Blaine County School District 61 are tracked and searchable. As a school agency, Blaine County School District 61 regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 9, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFQ?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Attachment A: Proposer Certification Form, Idaho construction manager license and certificate of authority, Idaho public works contractor license, Surety letter, Certificate of insurance, Disclosure o. Review the full document from Blaine County School District 61 for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Hailey, ID. The total projected area is 60000 sq ft. Review the full solicitation for detailed scope requirements.