ABC Unified School District Leal Elementary School Kitchen Addition Project 240512 Bid 2026
- Due
- Jan 31, 2026
- Deadline passed
- Posted
- Jan 1, 2026
- Primary contact
- Jesse Miller
- (949) 548-5000
The 30-second brief
ABC Unified School District is soliciting bids for the Leal Elementary School Kitchen Addition project (Project No. 240512 / 230512). The comprehensive scope of work includes selective demolition (Division 02), cast-in-place concrete and reinforcing (Division 03), and extensive foodservice equipment procurement and installation (Division 11) such as air curtains, walk-in refrigerators, freezers, serving counters, and stainless steel work tables. Electrical requirements (Division 26) cover common work results and installations. Site work includes earthwork, exterior improvements, and utilities (Divisions 31-33). The project is subject to DSA Application No. 03-125357 and requires compliance with California Building and Fire Codes. Bidders must provide itemized pricing for primary manufacturers and models specified, with bids valid for 30 days after the deadline.
Itemized bid proposal, Product data, Shop drawings, O&M manuals, As-built documents, Substitution applications
Compliance with specifications, primary manufacturer pricing, contractor qualifications (5 years minimum operation)
Hear what ABC Unified plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
ABC Unified School District is soliciting bids for the Leal Elementary School Kitchen Addition project (Project No. 240512 / 230512).
The comprehensive scope of work includes selective demolition (Division 02), cast-in-place concrete and reinforcing (Division 03), and extensive foodservice equipment procurement and installation (Division 11) such as air curtains, walk-in refrigerators, freezers, serving counters, and stainless steel work tables. Electrical requirements (Division 26) cover common work results and installations. Site work includes earthwork, exterior improvements, and utilities (Divisions 31-33). The project is subject to DSA Application No. 03-125357 and requires compliance with California Building and Fire Codes. Bidders must provide itemized pricing for primary manufacturers and models specified, with bids valid for 30 days after the deadline.
EVALUATION CRITERIA
3- Compliance with specifications
- Primary manufacturer pricing
- Contractor qualifications (5 years minimum operation)
REQUIRED DELIVERABLES
6- Itemized bid proposal
- Product data
- Shop drawings
- O&M manuals
- As-built documents
- Substitution applications
- Scope location
- Cerritos, CA
- Reported agency
- ABC Unified School District
Questions about this BID
How do I respond to this Bid from ABC Unified?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is January 31, 2026. The solicitation specifies required deliverables that must be addressed in your response. For questions, contact Jesse Miller.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including ABC Unified in CA, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Jesse Miller at (949) 548-5000. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Itemized bid proposal, Product data, Shop drawings, O&M manuals, As-built documents, Substitution applications. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Compliance with specifications, primary manufacturer pricing, contractor qualifications (5 years minimum operation)" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from ABC Unified?
All active and historical solicitations from ABC Unified are tracked and searchable. As a school agency, ABC Unified regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from ABC Unified for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Cerritos, CA. Review the full solicitation for detailed scope requirements.