Highway 92 left-turn lane expansion
City of YoungsvilleLouisiana- Detected
- Jul 9, 2026
- 116 days ago
- Sector
- Capital Projects
- Est. value
- Free account
Get pre-RFPs like this one as they surface.
Get briefs like this freeFree account · 30-second setup · No credit card
THE 30-SECOND BRIEF
Youngsville approved Change Order #2 for the Hwy 92 Improvements project, adding $323,126.62 to build two more left-turn lanes at Palfrey and Parc Bonin, construct a median at Prescott, add drainage, driveway repairs, and new striping. The total construction cost after change orders is now about $854,848, with a traffic betterment contribution negotiated from a nearby developer. Design is by McBade Engineers & Consultants, and the expanded scope signals additional construction, traffic control, and materials demand as work proceeds.
Change Order #2 itemizes added quantities for excavation, drainage structures, concrete, asphalt, striping, and traffic control; McBade Engineers is listed as project engineer (Project No. 8050).
From the meeting
- Meeting date
- July 9, 2026
- Agency
- City of Youngsville
More from City of Youngsville
Similar pre-RFPs forming now
Matching work at other agencies, before it reaches a bid portal.
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will City of Youngsville issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks City of Youngsville's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with City of Youngsville before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account sends you the pre-RFPs that fit what you sell, with the AI brief and the decision makers for the top matches in each digest.
Where can I find more capital projects government opportunities in Louisiana?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces capital projects pre-RFPs in Louisiana as soon as they appear — months before they reach bid portals.