West Drahner Road water main design
Town of Oxford charterMichigan- Detected
- Oct 14, 2026
- 20 days ago
- Sector
- Public Works
Get pre-RFPs like this one as they surface.
Get briefs like this freeFree account · 30-second setup · No credit card
From the meeting
Trustee Wagner listed design work for a water main extension on West Drahner Road for the October 14, 2026 meeting. The township is still at the design stage, so the project is not yet awarded. This is an open public works signal tied to a specific utility extension and likely future construction.
- Meeting date
- October 14, 2026
- Agency
- Town of Oxford charter
More from Town of Oxford charter
Similar pre-RFPs forming now
Matching work at other agencies, before it reaches a bid portal.
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will Town of Oxford charter issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Town of Oxford charter's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with Town of Oxford charter before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account sends you the pre-RFPs that fit what you sell, with the AI brief and the decision makers for the top matches in each digest.
Where can I find more public works government opportunities in Michigan?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces public works pre-RFPs in Michigan as soon as they appear — months before they reach bid portals.