Godwin pump replacement after failure
Town of PlymouthConnecticut- Detected
- Oct 19, 2026
- 9 days ago
- Sector
- Equipment
See the full project brief and when it goes to bid.
Unlock the full briefFree account · 30-second setup · No credit card
From the meeting
The WPCA had a follow-up discussion on screw pump failure and Godwin pump replacement. The agenda signals an operational equipment replacement need, but no award or vendor is named here. That makes this a useful incumbent-follow-on signal for pump supply, service, and emergency replacement support.
The issue was on the October 19, 2026 agenda.
- Meeting date
- October 19, 2026
- Agency
- Town of Plymouth
More from Town of Plymouth
Similar pre-RFPs forming now
Matching work at other agencies, before it reaches a bid portal.
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will Town of Plymouth issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Town of Plymouth's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with Town of Plymouth before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account unlocks this pre-RFP's source document, forecasted RFP timing, and verified Town of Plymouth decision-maker contacts.
Where can I find more equipment government opportunities in Connecticut?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces equipment pre-RFPs in Connecticut as soon as they appear — months before they reach bid portals.