PROJECTPRE-RFP

Backwash Hood Rehabilitation and Water Treatment Plant…

Cape San Juan Water District
Detected
Jun 30, 2026
119 days ago
Sector
Capital Projects
Est. value
Free account
Detected 119 days agoJun 30

See what it's worth before it's bid.

See the estimated value

Free account · 30-second setup · No credit card

THE 30-SECOND BRIEF

What's planned

The District plans extensive rehabilitation work at the Sidney N. Peterson Water Treatment Plant, including completing rehab of an old backwash hood in the north basin, replacing influent/effluent valves and 48-inch influent meters, and lining/repairing conveyance channels and associated valves. For FY 2026-27, the budget allocates approximately $1.9M to complete the second backwash hood rehab and rail track improvements, $740k for the main electrical panel upgrade, $682k for filter channel lining design, $120k for filter valve design, and several hundred thousand dollars more for center channel, chlorinator, pump and instrumentation upgrades. Many of these projects are currently in planning or early design stages, with detailed engineering and construction still to be procured. This package represents significant opportunities for mechanical and electrical contractors, specialty water-plant firms, and SCADA/instrumentation providers to support design-build or bid-build work at the treatment facility over the next 2–3 years.

Background

Individual projects are broken into design and construction phases; procurement has not been detailed in this agenda, indicating room for vendors to shape scopes.

From the meeting

Source
Backwash Hood Rehabilitation and Water Treatment Plant Valve/Meter Upgrades
Meeting date
June 30, 2026
Agency
Cape San Juan Water District

More from Cape San Juan Water District

Similar pre-RFPs forming now

Matching work at other agencies, before it reaches a bid portal.

Questions about this project

What is a pre-RFP?

A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.

When will Cape San Juan Water District issue an RFP for this project?

Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Cape San Juan Water District's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.

How can vendors engage with Cape San Juan Water District before the RFP is published?

Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account unlocks this pre-RFP's source document, forecasted RFP timing, and verified Cape San Juan Water District decision-maker contacts.

Where can I find more capital projects government opportunities in Washington?

Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces capital projects pre-RFPs in Washington as soon as they appear — months before they reach bid portals.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required