Bridge report flags 2027 work
Chelan CountyWashington- Detected
- Oct 5, 2026
- 24 days ago
- Sector
- Transportation
See the full project brief and when it goes to bid.
Unlock the full briefFree account · 30-second setup · No credit card
From the meeting
The 2026 annual bridge report says Chiwawa River Bridge #703A is scheduled for superstructure and deck replacement in 2027, and that the county is already in the PE phase for a deck seal program on six bridges. It also says the Moe Ridge Bridge needs a type, size and location study and that the Scour Program and Bridge Cleaning and Painting programs should be budgeted in future years. This is not a bid, but it is a strong forward-looking capital planning signal.
- Meeting date
- October 5, 2026
- Agency
- Chelan County
More from Chelan County
Similar pre-RFPs forming now
Matching work at other agencies, before it reaches a bid portal.
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will Chelan County issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Chelan County's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with Chelan County before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account unlocks this pre-RFP's source document, forecasted RFP timing, and verified Chelan County decision-maker contacts.
Where can I find more transportation government opportunities in Washington?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces transportation pre-RFPs in Washington as soon as they appear — months before they reach bid portals.