PROJECTACTIVE OPPORTUNITY

Bid 26-03 Design-Build HVAC Replacements at Multiple Schools

Morongo Unified
Detected
May 13, 2026
167 days ago
Sector
Infrastructure & Maintenance
Detected 167 days agoMay 13

See the full project brief and when it goes to bid.

Unlock the full brief

Free account · 30-second setup · No credit card

THE 30-SECOND BRIEF

What's planned

Morongo Unified School District has issued Bid 26-03 for turnkey, design‑build HVAC replacements at multiple sites, including Onaga Elementary, Twentynine Palms Elementary, Twentynine Palms Junior High, Twentynine Palms High, and Yucca Valley High School. The scope covers demolition and removal of existing evaporative coolers and HVAC units, installation of new Trane or District-approved equal rooftop and wall-mounted units, associated electrical and structural work, new condensers and boilers, and replacement of cooling tower components on several water-source heat pump loops.

What it means for vendors

The contractor must provide engineering services for DSA submission and approval, project development and management, temporary HVAC as needed for instructional continuity, and controls work including connecting approximately 341 smart thermostats via Wi‑Fi to the Venstar Skyport web portal. This is a prevailing wage, bonded project with bi‑weekly progress meetings and daily reporting via Procore or equivalent, and submittals of proposed equipment are required with the bid. Vendors in HVAC design-build, mechanical/electrical engineering, controls integration, temporary cooling, and Procore-compatible reporting have a live opportunity to bid or team as subs, with the district still in contractor selection phase per this bid scope document.

Background

Scope includes requirement to coordinate after-hours/weekend work around school operations and to provide owner operational training (up to 4 hours) on the controls/web portal.

From the meeting

Meeting date
May 13, 2026
Agency
Morongo Unified

Similar pre-RFPs forming now

Matching work at other agencies, before it reaches a bid portal.

Questions about this project

What is a pre-RFP?

A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.

When will Morongo Unified issue an RFP for this project?

Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Morongo Unified's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.

How can vendors engage with Morongo Unified before the RFP is published?

Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account unlocks this pre-RFP's source document, forecasted RFP timing, and verified Morongo Unified decision-maker contacts.

Where can I find more infrastructure & maintenance government opportunities in California?

Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces infrastructure & maintenance pre-RFPs in California as soon as they appear — months before they reach bid portals.

Work in government? Get Civic IQ free →

Start finding government buyers today.
It's free.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Get started free

No credit card required