Woodside Bridge drilling for new span
Ravalli CountyMontana- Detected
- Sep 17, 2026
- 47 days ago
- Sector
- Transportation
Get pre-RFPs like this one as they surface.
Get briefs like this freeFree account · 30-second setup · No credit card
From the meeting
MDT closed Woodside Bridge on Secondary Highway 373 for drilling tied to a subsurface investigation. The work is part of the construction design process for a new bridge at this location. Construction was anticipated to begin in 2029, pending design completion and funding.
This is an early signal for bridge design, geotechnical, and construction follow-on work.
- Meeting date
- September 17, 2026
- Agency
- Ravalli County
More from Ravalli County
Similar pre-RFPs forming now
Matching work at other agencies, before it reaches a bid portal.
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will Ravalli County issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Ravalli County's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with Ravalli County before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account sends you the pre-RFPs that fit what you sell, with the AI brief and the decision makers for the top matches in each digest.
Where can I find more transportation government opportunities in Montana?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces transportation pre-RFPs in Montana as soon as they appear — months before they reach bid portals.