Replacement metal plate for distribution box
Pompton Lakes MUANew Jersey- Detected
- Jul 20, 2026
- 106 days ago
- Sector
- Equipment
Get pre-RFPs like this one as they surface.
Get briefs like this freeFree account · 30-second setup · No credit card
From the meeting
Kendal Machinery was designing a replacement metal plate for the distribution box to divert water to the E tanks. That is a specific equipment redesign tied to water system operations, not a general discussion item. The design work suggests a small but concrete follow-on procurement or fabrication need may emerge once the replacement plate is finalized.
- Meeting date
- July 20, 2026
- Agency
- Pompton Lakes MUA
More from Pompton Lakes MUA
Similar pre-RFPs forming now
Matching work at other agencies, before it reaches a bid portal.
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will Pompton Lakes MUA issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Pompton Lakes MUA's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with Pompton Lakes MUA before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account sends you the pre-RFPs that fit what you sell, with the AI brief and the decision makers for the top matches in each digest.
Where can I find more equipment government opportunities in New Jersey?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces equipment pre-RFPs in New Jersey as soon as they appear — months before they reach bid portals.