Utility-scale battery storage permit
Calaveras CountyCalifornia- Detected
- Aug 13, 2026
- 75 days ago
- Sector
- Utilities
See the full project brief and when it goes to bid.
Unlock the full briefFree account · 30-second setup · No credit card
From the meeting
Double Springs Energy Storage, LLC proposed a utility-scale battery energy storage system with about 240 prefabricated battery enclosures and an on-site substation. The project would use lithium-ion lithium iron phosphate batteries, inverters, medium-voltage transformers, switchgear, fire suppression systems, and communication facilities tied to the PG&E Valley Springs Substation. An Initial Study/Mitigated Negative Declaration was prepared, so the project is still in the permitting and environmental review phase.
- Meeting date
- August 13, 2026
- Agency
- Calaveras County
More from Calaveras County
Similar pre-RFPs forming now
Matching work at other agencies, before it reaches a bid portal.
Questions about this project
What is a pre-RFP?
A pre-RFP is an early indicator that a government agency is planning a purchase — a project discussed in a board meeting, a budget line item, a new hire, or a grant award — captured before a formal RFP or bid is published. Acting on pre-RFPs gives SLED and B2G vendors months of lead time to build relationships and shape requirements.
When will Calaveras County issue an RFP for this project?
Pre-RFPs typically surface 6–18 months before a formal solicitation is published. Civic IQ tracks Calaveras County's meeting records, agendas, and budgets continuously and updates this pre-RFP as the project moves through the buying cycle toward an RFP.
How can vendors engage with Calaveras County before the RFP is published?
Vendors who reach out during the planning window can help shape requirements and build relationships with the decision-makers running the project. A free Civic IQ account unlocks this pre-RFP's source document, forecasted RFP timing, and verified Calaveras County decision-maker contacts.
Where can I find more utilities government opportunities in California?
Civic IQ monitors board meetings, agendas, budgets, and capital plans from 100,000+ state and local agencies and surfaces utilities pre-RFPs in California as soon as they appear — months before they reach bid portals.