Stillwater Utilities Authority - Lake McMurtry Pump Station - SUA Bid No. 10-2026
- Due
- Jan 20, 2027
- 54 days left
- Posted
- Aug 31, 2026
- Primary contact
- John McClenny
The 30-second brief
Stillwater Utilities Authority seeks bids for the construction of the Lake McMurtry Secondary Raw Water System Raw Water Pump Station, Project # 23WT03, SUA Bid No. 10-2026. The scope of work primarily includes construction of a new 24-million gallon per day (mgd) McMurtry Raw Water Pump Station featuring a CMU building, five (5) vertical turbine pumps and motors with variable frequency drives, valves, yard piping, electrical components, access road, and complete restoration of disturbed areas in Stillwater, Oklahoma. Bids are due by January 20, 2027, at 3:00 PM and must be submitted electronically through the City's Ionwave portal. A mandatory pre-bid conference was held on September 2, 2026. Bidders must provide a bid bond or certified check of not less than 5% of the bid amount, along with performance, maintenance, and statutory bonds.
Construction of a new 24-million gallon per day (mgd) McMurtry Raw Water Pump Station including a CMU Building, Five (5) vertical turbine pumps and motors with variable frequency drives, Pump pumping and valves, Yard piping, Electrical components, Access road and complete restoration of all areas disturbed by the work
Lowest and best responsible bidder
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Stillwater Utilities Authority seeks bids for the construction of the Lake McMurtry Secondary Raw Water System Raw Water Pump Station, Project # 23WT03, SUA Bid No. 10-2026.
The scope of work primarily includes construction of a new 24-million gallon per day (mgd) McMurtry Raw Water Pump Station featuring a CMU building, five (5) vertical turbine pumps and motors with variable frequency drives, valves, yard piping, electrical components, access road, and complete restoration of disturbed areas in Stillwater, Oklahoma. Bids are due by January 20, 2027, at 3:00 PM and must be submitted electronically through the City's Ionwave portal. A mandatory pre-bid conference was held on September 2, 2026. Bidders must provide a bid bond or certified check of not less than 5% of the bid amount, along with performance, maintenance, and statutory bonds.
EVALUATION CRITERIA
Lowest and best responsible bidder
REQUIRED DELIVERABLES
Construction of a new 24-million gallon per day (mgd) McMurtry Raw Water Pump Station including a CMU Building, Five (5) vertical turbine pumps and motors with variable frequency drives, Pump pumping and valves, Yard piping, Electrical components, Access road and complete restoration of all areas disturbed by the work
REQUIRED ATTACHMENTS
7- Bidder's bond
- Certified check
- Cashier's check (5%)
- Performance bond
- Maintenance bond
- Statutory bond
- Certificates of insurance
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Scope location
- Stillwater, OK
View all Water & sewer infrastructure RFPs →
Questions about this BID
How do I respond to this Bid from Stillwater Utilities Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is January 20, 2027. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact John McClenny.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Stillwater Utilities Authority in OK, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is John McClenny. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Construction of a new 24-million gallon per day (mgd) McMurtry Raw Water Pump Station including a CMU Building, Five (5) vertical turbine pumps and motors with variable frequency drives, Pump pumping and valves, Yard piping, Electrical components, Access road and complete restoration of all areas di. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Lowest and best responsible bidder" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Stillwater Utilities Authority?
All active and historical solicitations from Stillwater Utilities Authority are tracked and searchable. As a utility district agency, Stillwater Utilities Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of January 20, 2027, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: bidder's bond, certified check, or cashier's check (5%), performance bond, maintenance bond, statutory bond, certificates of insurance. Review the full document from Stillwater Utilities Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Stillwater, OK. Review the full solicitation for detailed scope requirements.