Stillwater Utilities Authority - Stillwater Regional Water Treatment Plant Solid Contact Units Rehabilitation - Bid No. 40-2025, Project #25WL03 - 2026
- Due
- Nov 11, 2026
- Deadline passed
- Posted
- Oct 10, 2026
- Primary contact
- John McClenny
Hear what Stillwater Utilities Authority plans next before it's posted.
Get alerts freeFree account · 30-second setup · No credit card
Summary
The Stillwater Utilities Authority invites sealed bids for Project #25WL03, Bid No. 40-2025, involving controls and partial equipment replacement for the Solids Contact Units (SCUs) and concrete repairs for the Middle and South SCUs at the Stillwater Water Treatment Plant (SUA WTP) in Stillwater, Oklahoma.
The scope encompasses water and wastewater facility improvements, mechanical and electrical controls, and concrete restoration work under Task Order No. 2, Volume II. Bids are due by November 11, 2026, at 3:00 PM CST, with electronic submission via IonWave and a mandatory pre-bid meeting scheduled for October 28, 2026. Requirements include a 5% bid bond, performance, maintenance, and statutory bonds, prevailing wage compliance under Davis-Bacon Act, American Iron and Steel (AIS) provisions, Build America, Buy America (BABA) Act requirements, and SAM.gov registration with a UEI number.
REQUIRED ATTACHMENTS
5- Bidder's bond, certified check, or cashier's check
- Performance bond
- Maintenance bond
- Statutory bond
- Certificates of insurance
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Scope location
- Stillwater, OK
Questions about this BID
How do I respond to this Bid from Stillwater Utilities Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 11, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact John McClenny.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Stillwater Utilities Authority in OK, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is John McClenny. Questions and answers are typically shared with all prospective bidders.
Show 3 more questions
Where can I find more RFPs from Stillwater Utilities Authority?
All active and historical solicitations from Stillwater Utilities Authority are tracked and searchable. As a utility district agency, Stillwater Utilities Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: bidder's bond, certified check, or cashier's check; performance bond; maintenance bond; statutory bond; certificates of insurance. Review the full document from Stillwater Utilities Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Stillwater, OK. Review the full solicitation for detailed scope requirements.