Summit County - Animal Control Gas-Fired Unit Heater Replacement - RFP FM 2026-0012 (2026)
- Due
- Dec 21, 2026
- 29 days left
- Posted
- Nov 20, 2026
- Primary contact
- Wayne Byrne
- (970) 668-4229
The 30-second brief
Summit County Facilities Maintenance Department is soliciting proposals for the replacement of six gas-fired hanging unit heaters at the Animal Control Facility, located at 58 Nancy's Place, Frisco, CO 80443. The project involves removing existing Modine and Rezoner heaters and furnishing and installing new Reznor UDX series high-efficiency unit heaters with high-altitude kits, new regulators, gas piping modifications, electrical and BAS control reconnections, and roof flashing/venting repairs. The scope requires compliance with National Fuel Gas Code and local building codes, provision of engineering/stamped drawings, performance and payment bonds if exceeding $50,000, and contractor background checks via the CJIS Vendor Management Program. Proposals are due by December 21, 2026, at 2:00 PM MST/MDT, following a mandatory pre-bid meeting on December 1, 2026, at 9:00 AM MST/MDT.
(2) Modine model #PD 150E0130 (150M BTU's) and (4) Rezoner model # F-25H (25M BTU's) removal; (4) new Rezoner UDX 45M Btu heaters with high altitude kit; (2) new Rezoner UDX 150M Btu heaters with high altitude kit; new natural gas regulators; 4-point ceiling support; through-the-roof venting
Cost, reputation/experience/efficiency of proponent, ability to perform contract within time specified, comparative quality of goods and services bid, performance under previous contracts, number and scope of conditions attached, project interest and understanding
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Summit County Facilities Maintenance Department is soliciting proposals for the replacement of six gas-fired hanging unit heaters at the Animal Control Facility, located at 58 Nancy's Place, Frisco, CO 80443.
The project involves removing existing Modine and Rezoner heaters and furnishing and installing new Reznor UDX series high-efficiency unit heaters with high-altitude kits, new regulators, gas piping modifications, electrical and BAS control reconnections, and roof flashing/venting repairs. The scope requires compliance with National Fuel Gas Code and local building codes, provision of engineering/stamped drawings, performance and payment bonds if exceeding $50,000, and contractor background checks via the CJIS Vendor Management Program. Proposals are due by December 21, 2026, at 2:00 PM MST/MDT, following a mandatory pre-bid meeting on December 1, 2026, at 9:00 AM MST/MDT.
EVALUATION CRITERIA
7- Cost
- Reputation/experience/efficiency of proponent
- Ability to perform contract within time specified
- Comparative quality of goods and services bid
- Performance under previous contracts
- Number and scope of conditions attached
- Project interest and understanding
REQUIRED DELIVERABLES
6- (2) Modine model #PD 150E0130 (150M BTU's) and (4) Rezoner model # F-25H (25M BTU's) removal
- (4) new Rezoner UDX 45M Btu heaters with high altitude kit
- (2) new Rezoner UDX 150M Btu heaters with high altitude kit
- New natural gas regulators
- 4-point ceiling support
- Through-the-roof venting
REQUIRED ATTACHMENTS
3- List of all subcontractors, independent contractors or sub-consultants
- Submittal of proposed work schedule and timeline
- Submittals of all proposed and alternate equipment
- Submit to
- Email inbox, shown to Civic IQ members.Sign up free to see it
- Scope location
- Frisco, CO
Questions about this RFP
How do I respond to this RFP from Summit County?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 21, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to an agency email inbox; Civic IQ members see the exact address. For questions, contact Wayne Byrne.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Summit County in CO, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Wayne Byrne at (970) 668-4229. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: (2) Modine model #PD 150E0130 (150M BTU's) and (4) Rezoner model # F-25H (25M BTU's) removal; (4) new Rezoner UDX 45M Btu heaters with high altitude kit; (2) new Rezoner UDX 150M Btu heaters with high altitude kit; new natural gas regulators; 4-point ceiling support; through-the-roof venting. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Cost, reputation/experience/efficiency of proponent, ability to perform contract within time specified, comparative quality of goods and services bid, performance under previous contracts, number and..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Summit County?
All active and historical solicitations from Summit County are tracked and searchable. As a county agency, Summit County regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 21, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: list of all subcontractors, independent contractors or sub-consultants; submittal of proposed work schedule and timeline; submittals of all proposed and alternate equipment. Review the full document from Summit County for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Frisco, CO. Review the full solicitation for detailed scope requirements.