Newberg School District 28J HVAC Maintenance and Repair Services RFP#2027-01 - 2026
- Due
- Dec 10, 2026
- 22 days left
- Posted
- Nov 9, 2026
- Contract term
- 2 years
- Primary contact
- Ben Burkhardt
- (503) 554-5022
The 30-second brief
Newberg School District 28J seeks proposals for HVAC preventive maintenance, inspection, servicing, and repair services across 14 district facilities, including elementary, middle, and high schools. Work includes servicing boilers, chillers, cooling towers, air handlers, split systems, rooftop units, and VRF systems, alongside Schneider controls integration. The contract term runs from January 4, 2027, through June 30, 2029, with up to two optional annual extensions. A mandatory pre-proposal meeting is scheduled for November 24, 2026, and proposals are due by December 10, 2026, at 2:00 PM. Evaluation criteria emphasize school district experience, technician qualifications, technical capability, response times, and evaluated annual price.
K-12 school district experience and references (9 points), Qualifications and experience of assigned technicians (9 points), HVAC technical capability and equipment experience (9 points), Schneider controls experience (5 points), Guaranteed response times (5 points), Evaluated annual price (13 points)
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Newberg School District 28J seeks proposals for HVAC preventive maintenance, inspection, servicing, and repair services across 14 district facilities, including elementary, middle, and high schools.
Work includes servicing boilers, chillers, cooling towers, air handlers, split systems, rooftop units, and VRF systems, alongside Schneider controls integration. The contract term runs from January 4, 2027, through June 30, 2029, with up to two optional annual extensions. A mandatory pre-proposal meeting is scheduled for November 24, 2026, and proposals are due by December 10, 2026, at 2:00 PM. Evaluation criteria emphasize school district experience, technician qualifications, technical capability, response times, and evaluated annual price.
EVALUATION CRITERIA
REQUIRED ATTACHMENTS
7- Contractor Information Form
- References
- Hourly rates
- Material markup
- Guaranteed response times
- Description of added services and personnel qualifications
- Exceptions to District contract terms
- Submit to
- Ben Burkhardt 703 S Blaine Newberg, OR 97132 US Email: [email protected]
- Duration
- 30 months
- Scope location
- Newberg, OR
- Reported agency
- Newberg School District 28J
Questions about this RFP
How do I respond to this RFP from Newberg School District 29J?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 10, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: Ben Burkhardt 703 S Blaine Newberg, OR 97132 US Email: [email protected]. For questions, contact Ben Burkhardt.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Newberg School District 29J in OR, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Ben Burkhardt at (503) 554-5022. Questions and answers are typically shared with all prospective bidders.
Show 6 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "K-12 school district experience and references (9 points), Qualifications and experience of assigned technicians (9 points), HVAC technical capability and equipment experience (9 points), Schneider co..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Newberg School District 29J?
All active and historical solicitations from Newberg School District 29J are tracked and searchable. As a school agency, Newberg School District 29J regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
What is the contract term for this solicitation?
The anticipated contract term is 2 years. Contract terms may include renewal options.
Is this solicitation still open for submissions?
Based on the posted deadline of December 10, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Contractor Information Form, references, hourly rates, material markup, guaranteed response times, description of added services and personnel qualifications, exceptions to District contract terms. Review the full document from Newberg School District 29J for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Newberg, OR. Review the full solicitation for detailed scope requirements.