Greenville Utilities Commission - Two (2) Autotransformer with Load Tap Changer for ECU Substation and Dickinson Ave Substation - 2027
Greenville Utilities CommissionUtility District · Greenville, NC- Due
- Jan 5, 2027
- 44 days left
- Primary contact
- Cleve Haddock
- (252) 551-1533
The 30-second brief
Greenville Utilities Commission seeks bids from qualified vendors for the furnishing and delivery of two (2) 20 MVA, 115 to 13.2Y/7.62 kV power transformers with load tap changers, designated for delivery to ECU Substation (150 Ficklin Drive) and Dickinson Ave Substation (2242 Dickinson Drive) in Greenville, North Carolina. The work includes basic delivery, unloading, handling, rigging, and placement onto the pad, along with a full five-year warranty, technical specifications adhering to IEEE/ANSI/NEMA standards, factory and field testing, temperature monitoring systems (SEL 2414), DGA online monitoring (Vaisala OPT100), surge arresters, and positive pressure systems. Bids are due by January 05, 2027, at 2:00 PM (ET). Evaluation will be based on Equivalent First Cost considering initial cost, transformer losses, and financing cost over a 20-year evaluation period.
Equivalent First Cost, initial cost, transformer losses, cost of financing, price, quality, delivery date, performance capabilities
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Greenville Utilities Commission seeks bids from qualified vendors for the furnishing and delivery of two (2) 20 MVA, 115 to 13.2Y/7.62 kV power transformers with load tap changers, designated for delivery to ECU Substation (150 Ficklin Drive) and Dickinson Ave Substation (2242 Dickinson Drive) in Greenville, North Carolina.
The work includes basic delivery, unloading, handling, rigging, and placement onto the pad, along with a full five-year warranty, technical specifications adhering to IEEE/ANSI/NEMA standards, factory and field testing, temperature monitoring systems (SEL 2414), DGA online monitoring (Vaisala OPT100), surge arresters, and positive pressure systems. Bids are due by January 05, 2027, at 2:00 PM (ET). Evaluation will be based on Equivalent First Cost considering initial cost, transformer losses, and financing cost over a 20-year evaluation period.
EVALUATION CRITERIA
8- Equivalent First Cost
- Initial cost
- Transformer losses
- Cost of financing
- Price
- Quality
- Delivery date
- Performance capabilities
REQUIRED ATTACHMENTS
4- Proposal Form
- Bid bond
- Exception/Variation Form
- Letter of Compliance to E-Verify
- Submit to
- Mailing address, shown to Civic IQ members.Sign up free to see it
- Scope location
- Greenville, NC
Questions about this BID
How do I respond to this Bid from Greenville Utilities Commission?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is January 5, 2027. Be sure to include all required attachments as outlined in the solicitation. Submissions go to a mailing address at the agency; Civic IQ members see the exact address. For questions, contact Cleve Haddock.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Greenville Utilities Commission in NC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Cleve Haddock at (252) 551-1533. Questions and answers are typically shared with all prospective bidders.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Equivalent First Cost, initial cost, transformer losses, cost of financing, price, quality, delivery date, performance capabilities" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Greenville Utilities Commission?
All active and historical solicitations from Greenville Utilities Commission are tracked and searchable. As a utility district agency, Greenville Utilities Commission regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of January 5, 2027, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Proposal Form, bid bond, Exception/Variation Form, Letter of Compliance to E-Verify. Review the full document from Greenville Utilities Commission for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Greenville, NC. Review the full solicitation for detailed scope requirements.