Wake County Public School System Boiler Replacement Project - East Millbrook MS RFP 251-27-184 (2026)
- Due
- Dec 9, 2026
- 12 days left
- Posted
- Nov 23, 2026
- Primary contact
- Clarence Rogers
The 30-second brief
The Wake County Public School System is seeking proposals for the Boiler Replacement Project at East Millbrook Middle School, located at 3801 Spring Forest Road, Raleigh, NC 27616. The scope of work includes the removal and disposal of one existing 2,000 MBH Lochinvar boiler and the installation of one owner-furnished Viessman CI2-2000 natural gas-fired boiler, along with associated piping, ductwork, electrical connections, controls integration (Spyder PUL6438SR controller, BAS Climatec Tridium Jace N4.7), neutralization tank, fiberglass insulation, and permits. Proposals are due by December 9, 2026, at 1:00 PM EST via the electronic Vendor Portal (eVP). A non-mandatory urged and cautioned site visit is scheduled for December 3, 2026, at 10:00 AM EST at the school, and written questions are due by December 4, 2026, at 11:00 AM EST.
Remove and dispose of existing 2, 000 MBH Lochinvar boiler; install owner-provided Viessman CI2-2000 natural gas-fired boiler; install owner-provided E90 primary pump; install 8" SS double wall flue vent and 8" combustion air duct; remove existing HW system XL15 controller and install new Spyder PUL6438SR controller; install neutralization tank and condensate drain piping; provide 2" fiberglass insulation with ASJ jacket and PVC fittings.
Prices offered, quality of articles offered, general reputation and performance capabilities of bidders, substantial conformity with specifications, suitability of articles for intended use, related services needed, date or dates of delivery and performance
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Wake County Public School System is seeking proposals for the Boiler Replacement Project at East Millbrook Middle School, located at 3801 Spring Forest Road, Raleigh, NC 27616.
The scope of work includes the removal and disposal of one existing 2,000 MBH Lochinvar boiler and the installation of one owner-furnished Viessman CI2-2000 natural gas-fired boiler, along with associated piping, ductwork, electrical connections, controls integration (Spyder PUL6438SR controller, BAS Climatec Tridium Jace N4.7), neutralization tank, fiberglass insulation, and permits. Proposals are due by December 9, 2026, at 1:00 PM EST via the electronic Vendor Portal (eVP). A non-mandatory urged and cautioned site visit is scheduled for December 3, 2026, at 10:00 AM EST at the school, and written questions are due by December 4, 2026, at 11:00 AM EST.
EVALUATION CRITERIA
7- Prices offered
- Quality of articles offered
- General reputation and performance capabilities of bidders
- Substantial conformity with specifications
- Suitability of articles for intended use
- Related services needed
- Date or dates of delivery and performance
REQUIRED DELIVERABLES
7- Remove and dispose of existing 2, 000 MBH Lochinvar boiler
- Install owner-provided Viessman CI2-2000 natural gas-fired boiler
- Install owner-provided E90 primary pump
- Install 8" SS double wall flue vent and 8" combustion air duct
- Remove existing HW system XL15 controller and install new Spyder PUL6438SR controller
- Install neutralization tank and condensate drain piping
- Provide 2" fiberglass insulation with ASJ jacket and PVC fittings
REQUIRED ATTACHMENTS
5- Attachment A
- Cost/Price proposal
- Qualifications (years in business, office locations, number of full-time staff)
- Relevant experience
- Three references
- Submit to
- Online portal, shown to Civic IQ members.Sign up free to see it
- Scope location
- Raleigh, NC
- Reported agency
- Wake County Public School System
View all Mechanical, plumbing, HVAC & fire sprinkler installation RFPs →
Questions about this RFP
How do I respond to this RFP from Wake County Schools?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 9, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions go to the agency's online bid portal; Civic IQ members see the exact link. For questions, contact Clarence Rogers.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Wake County Schools in NC, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Clarence Rogers. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Remove and dispose of existing 2, 000 MBH Lochinvar boiler; install owner-provided Viessman CI2-2000 natural gas-fired boiler; install owner-provided E90 primary pump; install 8" SS double wall flue vent and 8" combustion air duct; remove existing HW system XL15 controller and install new Spyder PUL. Proposals should clearly address how each deliverable will be met.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Prices offered, quality of articles offered, general reputation and performance capabilities of bidders, substantial conformity with specifications, suitability of articles for intended use, related s..." Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Wake County Schools?
All active and historical solicitations from Wake County Schools are tracked and searchable. As a school agency, Wake County Schools regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 9, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Attachment A, Cost/Price proposal, Qualifications (years in business, office locations, number of full-time staff), Relevant experience, Three references. Review the full document from Wake County Schools for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Raleigh, NC. Review the full solicitation for detailed scope requirements.