Niagara Frontier Transportation Authority - Taxiway J East Approach Removal - 2026
- Due
- Nov 17, 2026
- Due today
- Primary contact
- Cynthia Cirbus
- (716) 855-7300
The 30-second brief
The Niagara Frontier Transportation Authority is seeking bids for the Taxiway J East Approach Removal project in Niagara, NY. Contract work includes the removal of the eastern portion of Taxiway J of 33,135 SF between the Runway 6 end and the general aviation apron pavement, involving full depth pavement removal, asphalt pavement and subbase removal. Additional scope items feature embankment in place with topsoil and turf establishment, removal of existing taxiway edge light fixtures and airfield guidance signage, relocating existing taxiway edge lights, installation of new airfield electrical cable and counterpoise wire, and modification of existing airfield guidance sign legend panels. Submissions are due by November 17, 2026, at 10:00 AM at 181 Ellicott St, Buffalo, NY.
Removal of the eastern portion of taxiway j of 33, 135 SF; Full depth pavement removal including asphalt pavement and subbase removal; Embankment in place with topsoil and turf establishment; Removal of existing taxiway edge light fixtures and airfield guidance signage; Relocating existing taxiway edge lights and installation of new airfield electrical cable and counterpoise wire; Modification of existing airfield guidance sign legend panels
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
The Niagara Frontier Transportation Authority is seeking bids for the Taxiway J East Approach Removal project in Niagara, NY. Contract work includes the removal of the eastern portion of Taxiway J of 33,135 SF between the Runway 6 end and the general aviation apron pavement, involving full depth pavement removal, asphalt pavement and subbase removal.
Additional scope items feature embankment in place with topsoil and turf establishment, removal of existing taxiway edge light fixtures and airfield guidance signage, relocating existing taxiway edge lights, installation of new airfield electrical cable and counterpoise wire, and modification of existing airfield guidance sign legend panels. Submissions are due by November 17, 2026, at 10:00 AM at 181 Ellicott St, Buffalo, NY.
REQUIRED DELIVERABLES
6- Removal of the eastern portion of taxiway j of 33, 135 SF
- Full depth pavement removal including asphalt pavement and subbase removal
- Embankment in place with topsoil and turf establishment
- Removal of existing taxiway edge light fixtures and airfield guidance signage
- Relocating existing taxiway edge lights and installation of new airfield electrical cable and counterpoise wire
- Modification of existing airfield guidance sign legend panels
- Submit to
- 181 Ellicott St, Buffalo, NY, 14203-2221
- Scope location
- Niagara, NY
- Projected sq ft
- 33,135 sq ft
Questions about this BID
How do I respond to this Bid from Niagara Frontier Transportation Authority?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is November 17, 2026. The solicitation specifies required deliverables that must be addressed in your response. Submissions should be delivered to: 181 Ellicott St, Buffalo, NY, 14203-2221. For questions, contact Cynthia Cirbus.
Can small businesses or minority-owned firms bid on this Bid?
Most government agencies, including Niagara Frontier Transportation Authority in NY, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the Bid submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Cynthia Cirbus at (716) 855-7300. Questions and answers are typically shared with all prospective bidders.
What are the key deliverables?
The solicitation specifies the following deliverables: Removal of the eastern portion of taxiway j of 33, 135 SF; Full depth pavement removal including asphalt pavement and subbase removal; Embankment in place with topsoil and turf establishment; Removal of existing taxiway edge light fixtures and airfield guidance signage; Relocating existing taxiway e. Proposals should clearly address how each deliverable will be met.
Show 4 more questions
Where can I find more RFPs from Niagara Frontier Transportation Authority?
All active and historical solicitations from Niagara Frontier Transportation Authority are tracked and searchable. As a airport authority agency, Niagara Frontier Transportation Authority regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of November 17, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this Bid?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. Review the full document from Niagara Frontier Transportation Authority for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Niagara, NY. The total projected area is 33135 sq ft. Review the full solicitation for detailed scope requirements.