Lewiston Public Schools Electrical Engineering Design Services - McMahon & Montello Elementary Schools RFQ/P 2026
- Due
- Dec 18, 2026
- 28 days left
- Posted
- Nov 18, 2026
- Primary contact
- Bill Grant
The 30-second brief
Lewiston Public Schools is seeking proposals from licensed electrical engineering firms for design services related to interior lighting and lighting controls upgrades at McMahon Elementary School and Montello Elementary School in Lewiston, Maine. The project covers approximately 186,205 total square feet across both schools, replacing existing interior lighting and controls with new LED light fixtures and room-controller-type lighting controls complying with energy codes. The engagement includes survey and design phases from existing conditions documentation through complete, stamped construction documents suitable for competitive public bidding, with optional bidding assistance and construction administration phases. Submittals are due by December 18, 2026, at 4:00 PM local time, submitted electronically to district contacts. Evaluation is based on demonstrated competence and qualifications, technical approach, and price pursuant to Board Policy DJ.
Demonstrated competence and qualifications, technical merit, price
Bids like this start as pre-RFPs. Get the next ones early.
Get matched pre-RFPs freeFree account · 30-second setup · No credit card
Summary
Lewiston Public Schools is seeking proposals from licensed electrical engineering firms for design services related to interior lighting and lighting controls upgrades at McMahon Elementary School and Montello Elementary School in Lewiston, Maine.
The project covers approximately 186,205 total square feet across both schools, replacing existing interior lighting and controls with new LED light fixtures and room-controller-type lighting controls complying with energy codes. The engagement includes survey and design phases from existing conditions documentation through complete, stamped construction documents suitable for competitive public bidding, with optional bidding assistance and construction administration phases. Submittals are due by December 18, 2026, at 4:00 PM local time, submitted electronically to district contacts. Evaluation is based on demonstrated competence and qualifications, technical approach, and price pursuant to Board Policy DJ.
EVALUATION CRITERIA
3- Demonstrated competence and qualifications
- Technical merit
- Price
REQUIRED ATTACHMENTS
10- Letter of interest
- Firm qualifications and experience
- Key personnel proposed
- Current workload and availability
- At least three references
- Proposed approach and methodology
- Proposed schedule by phase
- Fee proposal as a firm fixed fee by phase
- Evidence of professional liability insurance
- Joint venture or subconsultant details
- Submit to
- Email inbox, shown to Civic IQ members.Sign up free to see it
- Scope location
- Lewiston, ME
- Projected sq ft
- 186,205 sq ft
Questions about this RFP
How do I respond to this RFP from Lewiston Public Schools?
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is December 18, 2026. Be sure to include all required attachments as outlined in the solicitation. Submissions go to an agency email inbox; Civic IQ members see the exact address. For questions, contact Bill Grant.
Can small businesses or minority-owned firms bid on this RFP?
Most government agencies, including Lewiston Public Schools in ME, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
What happens after the RFP submission deadline?
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
Can I ask questions about this solicitation before submitting?
Yes, most solicitations allow vendors to submit questions during a designated period. The primary contact is Bill Grant. Questions and answers are typically shared with all prospective bidders.
Show 5 more questions
What are the evaluation criteria for this solicitation?
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Demonstrated competence and qualifications, technical merit, price" Vendors should carefully align their proposals with each criterion to maximize their score.
Where can I find more RFPs from Lewiston Public Schools?
All active and historical solicitations from Lewiston Public Schools are tracked and searchable. As a school agency, Lewiston Public Schools regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
Is this solicitation still open for submissions?
Based on the posted deadline of December 18, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
What documents are required to bid on this RFP?
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Letter of interest, Firm qualifications and experience, Key personnel proposed, Current workload and availability, At least three references, Proposed approach and methodology, Proposed schedule by ph. Review the full document from Lewiston Public Schools for the complete list.
What is the scope of this project?
This solicitation defines a specific project scope. The scope covers the following locations: Lewiston, ME. The total projected area is 186205 sq ft. Review the full solicitation for detailed scope requirements.