Kansas Department of Transportation, Topeka, KS·State
Track Kansas Department of Transportation solicitations
Get alerted when Kansas Department of Transportation posts a new RFP, and see the pre-RFP signals months before it publishes.
Kansas Department of Transportation is seeking bids for pedestrian and bicycle paths on 5th St from Main to K-15 and from 5th St North on Oak St to the school in the city of Linn in Washington County, KS. Length is 0.56 mi. Project includes earthwork, rock excavation, sidewalk construction, curb and gutter, concrete pavement, HMA patching, signing, and pavement marking. Submission deadline is October 21, 2026 at 1:00 P.M. Local Time via Bid Express. Total contract working days is 50 with 40 restricted days. Federal aid project number ACTA-T057(201), State project number 101 TE 0572-01, Contract ID 526102292.
Price
MOBILIZATION, CONTRACTOR CONSTRUCTION STAKING, REMOVAL OF EXISTING STRUCTURES, FOUNDATION STABILIZATION, TRAFFIC CONTROL, FLAGGER, ROCK EXCAVATION, COMMON EXCAVATION, COMPACTION OF EARTHWORK, WATER (GRADING), SIDEWALK CONSTRUCTION (4"), SIDEWALK RAMP, CLEARING AND GRUBBING, CROSS ROAD PIPE, END SECTION, TRENCH DRAIN, SLOPE DRAIN, TEMPORARY FERTILIZER, SOIL EROSION MIX, EROSION CONTROL, SEDIMENT REMOVAL, TEMPORARY BERM, FILTER SOCK, GEOTEXTILE, SILT FENCE, WATER (EROSION CONTROL), CURB AND GUTTER, GUTTERS (SPECIAL), CONCRETE PAVEMENT, AGGREGATE BASE, WATER (AGGREGATE BASE), HMA-COMMERCIAL GRADE (PATCHING), SIGN (FLAT SHEET), SIGN POST, SIGN POST FOOTING, PAVEMENT MARKING (INTERSECTION GRADE)
Certification-Noncollusion & History of Debarment, Certification-Financial Prequalification Amount, Declaration-Limitations on Use of Federal Funds for Lobbying, Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm, Tax Clearance Certificate, Bid bond
Common questions about this solicitation, answered from the record.
Review the full solicitation document for submission requirements, evaluation criteria, and deadlines. The submission deadline is October 21, 2026. The solicitation specifies required deliverables that must be addressed in your response. Be sure to include all required attachments as outlined in the solicitation. Submissions should be delivered to: http://www.bidx.com.
This solicitation includes specific evaluation criteria that will be used to score proposals. The criteria include: "Price" Vendors should carefully align their proposals with each criterion to maximize their score.
All active and historical solicitations from Kansas Department of Transportation are tracked and searchable. As a state agency, Kansas Department of Transportation regularly publishes solicitations. Visit the agency profile to see current open bids, past contracts, vendor relationships, and decision-maker contacts.
The anticipated contract term is 2 months. Contract terms may include renewal options.
Based on the posted deadline of October 21, 2026, this solicitation appears to still be accepting submissions. Deadlines may change through amendments or addenda, so always verify the current status directly with the issuing agency before preparing your response.
Requirements vary by solicitation, but common documents include a technical proposal, cost/price proposal, proof of insurance, relevant certifications, past performance references, and any forms specified in the solicitation. This solicitation specifically requires the following attachments: Certification-Noncollusion & History of Debarment, Certification-Financial Prequalification Amount, Declaration-Limitations on Use of Federal Funds for Lobbying, Certification-Contractual Services wit. Review the full document from Kansas Department of Transportation for the complete list.
Most government agencies, including Kansas Department of Transportation in KS, encourage participation from small businesses, minority-owned, women-owned, and disadvantaged business enterprises (MBE/WBE/DBE). Check the full solicitation for any small business participation goals.
After the deadline, the issuing agency reviews all submissions against the stated evaluation criteria. This typically includes a compliance check, technical evaluation, cost analysis, and may involve oral presentations with shortlisted vendors.
This solicitation defines a specific project scope. The scope covers the following locations: Linn, KS. Review the full solicitation for detailed scope requirements.
The solicitation specifies the following deliverables: MOBILIZATION, CONTRACTOR CONSTRUCTION STAKING, REMOVAL OF EXISTING STRUCTURES, FOUNDATION STABILIZATION, TRAFFIC CONTROL, FLAGGER, ROCK EXCAVATION, COMMON EXCAVATION, COMPACTION OF EARTHWORK, WATER (GRADING), SIDEWALK CONSTRUCTION (4"), SIDEWALK RAMP, CLEARING AND GRUBBING, CROSS ROAD PIPE, END SECT. Proposals should clearly address how each deliverable will be met.
B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.
Other solicitations from Kansas Department of Transportation.